http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Keiji Tajima,Hirokazu. Ishiguro,Toshihiko Aso 한국강구조학회 2021 International Journal of Steel Structures Vol.21 No.4
This paper describes a study on improving redundancy in a 240 m span steel Pratt truss bridge. Redundancy was evaluated from two perspectives. The fi rst perspective was how many members would induce bridge collapse owing to their own damage, and the second perspective was how many members would be damaged owing to another member’s damage. Members corresponding to these two perspectives were widely present throughout the subject truss bridge. As a measure to improve redundancy of the subject truss bridge, the method of installing alternative load paths by retrofi tting additional braces was studied. Three proposals with diff erent geometry of the additional braces were compared, and "X bracing", which equipped X-shaped braces by adding braces in the opposite direction to the existing diagonal member, demonstrated excellent performance. In addition, the eff ect of the method retrofi tting the cable along the member was also studied. Next, the placement patterns of "X bracing" on 18 truss panels of the subject truss bridge were examined using an optimization technique. It was clarifi ed that examination of the placement for the additional braces was important for the effi cient improvement of redundancy, and that the optimum placement of X bracing was in the alternating areas. Finally, the buckling gusset plate of the I-35 W bridge was also in the alternating area, suggesting that reinforcement of the alternating area might be important for redundancy of truss bridges.