RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Incorporating BIM in the Final Semester Undergraduate Project of Construction Management - A Case Study in Fuzhou University

        Liyuan Wang,Xueyuan Yan,Binghui Fan,Ruoyu Jin,Tong Yang,Georgios Kapogiannis 대한토목학회 2020 KSCE JOURNAL OF CIVIL ENGINEERING Vol.24 No.8

        This pedagogical study presents building information modeling (BIM) education in the final semester construction management (CM) program. The case study conducted in Fuzhou University extends BIM education from a single BIM course in earlier undergraduate years to the senior year’s final semester project, which was designed to enable BIM utilization in multiple construction tasks (e.g., 3D site planning). This study consists of two major parts. The first part starts with the newly designed course of the final semester project of CM students. Students’ final semester project work is demonstrated depending on their selected deliverable type, which includes full BIM application group work, two partial BIM application types (i.e., construction planning/scheduling, and take-off estimate), and a research dissertation. The second part starts from the research hypothesis of whether the different deliverable type selected by students would affect their perceptions towards the final project and their professional career. Based on a follow-up questionnaire survey to the whole CM student sample aiming to test the hypotheses with statistical analyses (e.g., analysis of variance and the post-hoc analysis), it was indicated that all the four different deliverable types (i.e., subgroups) could lead to consistent perceptions of the final semester project towards their career development. However, subgroup differences were found. For example, students from the subgroup of full BIM application perceived that they had the highest level of hands-on skill enhancement throughout the project, possibly due to the fact that they linked BIM software tools to virtual reality (VR) hardware. Suggestions were provided to update the future BIM pedagogy in the final semester project, such as proper guide of CM students to opt their project deliverable type depending on their career interests, motivations in BIM utilization, and skill development needs. This current study provides insights in BIM education in terms that: 1) BIM education could be enhanced from a single course level to the senior year project in the CM program level; 2) different options offered in the final stage project within the CM curriculum might affect students’ perceptions towards BIM or their career development; and 3) the experience learned from this case study could be shared in the global community of construction education to update the curriculum incorporating information and communication technologies (e.g., BIM and VR). Future educational work in BIM could continue adopting existing educational theories (e.g., Bloom’s Taxonomy) by addressing the various levels of student learning, and viewing BIM in the bigger picture of digital construction.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼