RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        An Integrated AHP.VIKOR Methodology for Facility Layout Design

        Hamidreza Shokri,Behzad Ashjari,Morteza Saberi,Jin Hee Yoon 대한산업공학회 2013 Industrial Engineeering & Management Systems Vol.12 No.4

        A facility layout design (FLD) problem can be generally introduced as assignment of facilities (departments) to a site such that a set of criteria are satisfied or some objectives are minimized (maximized). Hence, it can be considered as a multi-criteria problem due to the presence of qualitative criteria such as maintenance or flexibility and quantitative criteria such as the total cost of handling material. The VIKOR method was developed to solve multiple criteria decision making problems with conflicting and non-commensurable (different units) criteria, assuming that compromising is acceptable for conflict resolution, the decision maker wants a solution that is the closest to the ideal, and the alternatives are evaluated according to all established criteria. This paper proposes a hierarchical analytic hierarchy process (AHP) and VIKOR approach to solve the FLD problem. A computer-aided layout-planning tool is adopted to generate the facility layout problems, as well as their quantitative data. The qualitative performance measures are weighted by AHP. VIKOR is then used to solve the FLD problem. Finally, the proposed integrated procedure is applied to three real-time examples.

      • KCI등재

        A Robust Solution to Resource-Constraint Project Scheduling Problem

        Milad Keshavarz Kord Mahalleh,Behzad Ashjari,Fereshteh Yousefi,Morteza Saberi 한국지능시스템학회 2017 INTERNATIONAL JOURNAL of FUZZY LOGIC and INTELLIGE Vol.17 No.3

        This paper aims to propose a solution to the resource-constraint project scheduling problem (RCPSP). RCPSP is a significant scheduling problem in project management. Currently, there are insufficient studies dealing with the robustness of RCPSP. This paper improves the robustness of RCPSP and develops a Robust RCPSP, namely RRCSP. RRCSP is structured with relaxing a fundamental assumption that is ‘the tasks start on time as planned’. Relaxing this assumption makes the model more realistic. The proposed solution minimizes the makespan while maximizing the robustness. Maximizing the robustness requires maximizing floating time of activities (it is NP hard). This creates more stability in the project finishing time. RCPSP stands as the root cause of many other problems such as multi-mode resourceconstrained project scheduling problems (MRCPSP), multi-skill resource-constrained project scheduling problem (MSRCPSP), or similar problems and hence proposing a solution to this problem contributes to pave a new line for future research in other mentioned areas. The applicability of the proposed model is examined through a numerical example.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼