http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Marıa Dolores Vıctor-Ortega,Javier Miguel Ochando Pulido,Diego Airado-Rodrıguez,Antonio Martı´nez-Ferez 한국공업화학회 2016 Journal of Industrial and Engineering Chemistry Vol.34 No.-
The final purification of two-phase olive mill wastewater (OMW-2) by ion exchange (IE) was addressed. This pollutant effluent was previously subjected to Pseudo-Fenton secondary treatment. Consequently,OMW-2 presented high concentrations of chloride, sodium, phenols and iron, which hinder its discharge. Experimental design was used to optimize the IE process. Around 88% removal efficiencies of thesepollutants were achieved when initial pH, temperature and flow rate were 5.1, 26.8 8C and 12.1 L h 1,respectively. Finally, 28 L treated water could be accomplished in continuous mode under optimalconditions, complying with standards for reuse in the olive oil production process.