지중 전력 선로 편단접지 시스템에서의 병행지선 및 SVL 설치방안
하체웅(C. W. Ha) 대한전기학회 2008 대한전기학회 학술대회 논문집 Vol.2008 No.11
In underground power cable system, the device for limiting over-voltage is needed when transient over-voltage break out between sheath and ground. For this reason, the SVL(Sheath Voltage Limiter) has been applied on weak points. But the broken SVLs which are installed on the single point bonding system on underground cable are frequently found. In this paper, EMTP(Electromagnetic Transient Program) is utilized to analyze effects on the installation methodology of the parallel ground conductor and SVL for the single point bonding system on the underground cable. The result shows that the proposed installation methodology can be applied for single point bonding system and contribute for power system stabilization.
345㎸ GIL 계통에서 크로스본드 접지방식 적용 검토
하체웅(C. W. Ha) 대한전기학회 2009 대한전기학회 학술대회 논문집 Vol.2009 No.7
최근 국내에서 345kV GIL(Gas Insulated Transmission Lines) 시스템의 실 계통 도입이 검토되고 있다. 현재까지 GIL은 원자력 발전소에서 주변압기로부터 스위치 야드까지 1km 미만의 거리에 소규모로 설치되어 운영되고 있다. 하지만 향후 본격적으로 GIL 시스템이 도입된다면 발전소 구내뿐만 아니라 수 km 이상 되는 송전급 선로에도 적용될 것이 예상된다. 현재 GIL의 시스(외함)는 100~120m 정도마다 접지를 하는 직접접지 형태를 취하고 있으나 시스에 흐르는 순환전류가 부하전류의 97% 이상 된다. 따라서 이에 따른 손실이 많이 발생되고 있어 도체에 흘릴 수 있는 허용전류 값이 감소하게 된다. 본 논문에서는 GIL 시스템에 크로스본드 접지방식을 적용하였을 때 시스 순환전류 감소 효과에 대해서 검토하고, 아울러 뇌써 지나 스위칭 써지에 의한 절연통의 열화 등에 대비하기 위하여 절연통보호장치의 설치 방안에 대해서 검토하였다.