http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
신재생에너지 발전원을 고려한 발전기 예방정비계획수립에 관한 연구
이연찬(Yeonchan Lee),오웅진(Ungjin Oh),최재석(Jaeseok Choi),정명훈(Myeonghoon Jung) 대한전기학회 2018 전기학회논문지 Vol.67 No.5
The purpose of this paper is to establish a new optimum Generator Maintenance Scheduling(GMS) considering renewable energy generator. In this paper, the total renewable energy generation is estimated using hourly capacity factor of renewable energy generator. The GMS was optimized with the objective function of maximizing the minimum reserve rate, minimizing the probabilistic production cost, minimizing the loss of load expectation, and minimizing CO₂ emissions. In the case study of this paper, GMS considering renewable energy and GMS not considering renewable energy are shown by each objective function. And it shows scenarios of the reliability, the environmental and economical factors when two nuclear power plants inputted and ten coal thermal power plants shut downed respectively.