철도시스템의 시스템엔지니어링 관점에서 종합시운전에 대한 고찰
김병도(Kim B.D.),강병모(KANG B.M.),김영선(Kim Y.S.),안효권(Ahn H.K.),김종선(Kim J.S.) 한국철도학회 2009 한국철도학회 학술발표대회논문집 Vol.2009 No.11월
The HEMU-400X(High-speed Electric Multiple Unit) project, which was started in 2007, have achieved a goal of first stage successefully, and then entered into second stage to finalize a design and manufacture the real train. It is very important to verify the performance of the developed train because of the first high speed electric multiple unit train in korea. And also it is important to verify how the developed train has a performance with existing facilities. The each sub-system of a railway, such as rail, rolling stock, catenary, etc, have to harmonize with each other to secure a optimized performance and safety. In this paper, the authors indicates a methodology to verify a safety of the railway facilities and developed train effectively by reviewing a requirements of the systems engineering to secure railway safety, the case study of KTX for the full system commissioning and the test items required by the law.
차세대고속철도기술개발사업 시스템인터페이스 시험기술 개발
강병모(Kang B.M),정상국(Jeong S.G),안효권(Ahn H.K),최환침(Choi. H.C),유승위(Yu S.W) 한국철도학회 2010 한국철도학회 학술발표대회논문집 Vol.2010 No.7
Since a long time ago, many railway engineers analyze and discuss the interface between the sub-system of railway, such as a wheel/rail interface, pantograph/catenary interface etc. The verifying of the system interface could help to achive the optimized performance and safety of the railway system considering that the railway system is constructed by various engineerings, such as civil, mechanical, electrical, etc. A rolling stock with distributed drive system, which will be developed by HEMU-400x project, is capable of running on high speed line and conventional line in Korea. To verify the performance of rolling stock, test run will be done with revenue service line. And the test items of the system interface have to be selected to verify a functional compatibility and physical force between rolling stock and infrastructure. In this paper, the authors will indicates the test items to verify system interface. To achive the conclusion, the authors analyze a specification of the development train and the design value of Seoul-Busan high speed line, which will be used for testing of the development train, and also, study the various case of high speed train commissioning.