http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
김백(B. Kim),문영현(Y. H. Moon),유헌수(H. S. Ryu),송경빈(K. B. Song),조연옥(Y. O. Cho),안충훈(C. H. Ahn) 한국철도학회 2001 한국철도학회 학술발표대회논문집 Vol.- No.-
The conventional SCADA adopted for the electric railway has the mere function of controlling and monitoring the hardware itself. Lack of the functions necessary for the fault prevention and the system recovery requires the operators to depend on their intuition and experience. To make up for these shortcomings of the conventional SCADA, PIS(power Information System) visually offers integrated information for the optimal operation of the power system by manipulating the raw data acquired from the SCADA. In this paper we have studied the variety of information and its feasibility that can be offered individually by PIS.
김백(B. Kim),정광우(K. W. Chung),문영현(Y. H. Moon),안충훈(C. H. Ahn) 한국철도학회 2002 한국철도학회 학술발표대회논문집 Vol.- No.-
The conventional SCADA being used in the electric railway has the basic functions of remote controlling and system monitoring. Since the SCADA lacks the functions essential to the fault prevention and the system recovery, operators must depend on their intuition and experience to considerable extent. Visually integrated information offered by PIS contributes to the fast system recovery and the state judgment of the power system, and makes a novice be adapted for the operation easily. In this paper, we have studied the various functions and its feasibility that can be offered by PIS.