http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
차량탑재형 고소작업대의 재해분석을 통한 취약 구조부의 안전성 향상 방안에 관한 연구
유용태,서수은,유희재,강경식,Yoo, Yong-tae,Seo, Su-eun,You, Hee-Jae,Kang, Kyung-sik 대한안전경영과학회 2017 대한안전경영과학회지 Vol.19 No.1
The findings were summarized as follows. The safety check by manufacturer showed that 6 of 13 companies are over the average occurrence of defects. It was expected that there would be a difference between manufacturing technology capability and production system of each manufacturer. Consequently, manufacturers should institutionally improve and strengthen certification items for the upward standardization of safety certification before factory. Second, the safety check by year showed that the results of this study accord with those of previous studies on defect time. Consequently, manufacturers should classify the 3-year-old equipment for vehicle-mounted MEWP into a special check subject to do a nondestructive test according to proven results, and also reflect the test in a safety test system to do regular preventive activities of equipment defects. Third, the safety check by part showed that the boom and outrigger parts of vehicle-mounted MEWP have the most defects. Stress concentration resulted in defects as the boom part was most frequently operated in the structural parts for a real work. To prevent this, it is suitable to improve the hardness of boom materials. The outrigger part needs improvement in safety devices with materials. As an outrigger supports the overturning moment of equipment, it is most affected by its load based on the operating radius, resulting in fatigue crack.
안용모(Ahn Yong-mo),예병길(Yae Byung-Gil),서수은(Seo Su Eun) 한국철도학회 2007 한국철도학회 학술발표대회논문집 Vol.- No.-
This project of total city plan is developed for the area of DONGDAEGU station in the field of new city-core which is adapted for a forefront city and rational restructuring of the city space and improving for balanced growth according to the first phase operation of Korean high speed line and its complete construction to BUSAN. Bring a new heart of this city of the area of DONGDAEGU station which is a gateway to DAEGU city so that the area contrives a new creation of the city space, balanced developing and activation of a region economy. Deliberate for plan of private capital for harmonious to develop a territory of station therefore it raises an emblem of DAEGU city and activates an economy of the city according to the new trend of the condition of transportation integrated administration of a large regionand new development of DONGDAEGU station.
안용모(Ahn Yong-mo),예병길(Yae Byung-Gil),서수은(Seo Su Eun) 한국철도학회 2007 한국철도학회 학술발표대회논문집 Vol.- No.-
This project of total city plan is developed for the area of DONGDAEGU station in the field of new city-core which is adapted for a forefront city and rational restructuring of the city space and improving for balanced growth according to the first phase operation of Korean high speed line and its complete construction to BUSAN. Bring a new heart of this city of the area of DONGDAEGU station which is a gateway to DAEGU city so that the area contrives a new creation of the city space, balanced developing and activation of a region economy. Deliberate for plan of private capital for harmonious to develop a territory of station therefore it raises an emblem of DAEGU city and activates an economy of the city according to the new trend of the condition of transportation integrated administration of a large regionand new development of DONGDAEGU station.