According to recent urbanization, urban expansion and becoming bigger of equipment, under lower lands of transmission line and the risk of contact with objects have been being increased. Due to increasing of demand for electricity Quality of power users, the users have been increasing complaints and compensation claims which are as a result of a power failure. Every year, the budget of tens of billions which is appropriated for construction of securing separation distance in the previous method of construction, has been collected by reason of failure of spaces security. The reason why developed equipment for raising the iron tower is excessive construction cost of the previous method of construction. This invention is to resolve these issues. Setting up Helper Tower using by exist iron tower can solve problem of installing temporary or newly-set tower. Therefore, this method can be solved problems of compensation costs for spaces security and complaints of power users. And this method can save cost by setting temporary tower with using materials of exist iron tower.
백승도(Seung-Do Baik),김태영(Tai-Young Kim),민병욱(Byeong-Wook Min),김왕주(Wang-Joo Kim),최진성(Jin-Sung Choi),김신철(Shin-Chul Kim) 대한전기학회 2006 대한전기학회 학술대회 논문집 Vol.2006 No.7
The proposed site selection for transmission system construction is applied by KEPCO's regulation of the site selection criteria and it is confirmed through the deliberation of site selection committee and talking with local authority, by means of study on present status and site survey, to verify impediment of national land use and development plan. Therefore, it is true that KEPCO has difficulty in timely completion of power facility construction because of civil appeals due to insufficiently evaluate resistance factor of stakeholder and stubborn resistance of inhabitants. This paper describes the PEES(power effect estimation system) which contributed to timely completion of transmission system construction to solve the above difficulty by utilizing IT(Information Technology) such as GIS(Geographic Information System) and LiDAR for the proposed site section. PIES evaluates project impacts on commencement of construction and finds out counter measures then makes public construction information after prediction and analysis of stakeholder's resistance factor.