http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
건축물 용도별 분류에 따른 철근 콘크리트공사 소요수량 개산에 관한 연구
정노익 釜山工業大學校 1995 論文集 Vol.37 No.-
The purpose of this study is to survey for the approximate quantity of concrete, form-work, and reinforcing-bar for to excute on the various buildings of classified according to its use. The data of approximate quantity is useful to us when we estimate the building cost of to excute roughly without the time enough for it detaily. The researching data are the results of 110 buildings built up during '92∼94 in Pusan & Kyung-nam, and that are to be written in several architectural estimate offices in Pusan. The quantity data of concrete, form-work, and reinforcing-bar are expressed as the ratio of the total quantity to the building floor area of each. The results are following. 1) The quantity of concrete : average 0.713(range;0.426∼1.301)㎥/㎡ 2) The quantity of form-work :average 4.33(range;1.905∼8.235)㎡/㎡ 3) The quantity of reinforcing-bar : average 0.0754(range;0.034∼0.154)ton/㎡