http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
오철수 경북대학교 전자기술연구소 2001 電子技術硏究誌 Vol.22 No.2
Solar City program is initiated by IEA, one organization of OECD, and Daegu is recently nominated by IEA as one solar city in initial stage. The principal aim of Solar City is maintaining the city's environment as it should be in the future. The main subject of Solar City is solar energy. The photovoltaic and solar thermal are his direct energy. The wind, biomass, geothermal and tidal power are its derivative energy. To develop and to disseminate these natural energy is main objective of Solar City. This article is a introduction to the technology related with these Solar City program and is aiming to promote the concerned people for a participation to the Solar City projects.
오철수,손성재 대한전기학회 1971 전기의 세계 Vol.20 No.1
공업전자의 현황과 전망에서는 SCR을 주축으로 한 반도체소자를 이용한 Energy변환 및 제어의 분야의 반도체소자를 매개로한 Energy변환과 제어 및 기계의 전자화된 조절장치를 체계화한 전기공학의 분야에 대해 설명했으며, 우주통신과 우주선 추적에서는 아폴로 S대통일계통, Goddard식 거리속도추적계통, 중계위성에 대해 설명했으며 Feedback inbiological systmems lecture notes에서는 Familar definition of Feedback, Definition of Control Feedback에 대해 논하였다.
오철수,서영택,권상진 경북대학교 전자기술연구소 2001 電子技術硏究誌 Vol.22 No.1
Under a keen watching of many concerned people, the wind power plant in Ullungdo has erected, but Korean Electric Power Co. does not place a good qualification-record on it and the grid operation of Ullung wind power plant is, for that reason, now going in a very reluctant status. However, the erection of Ullung wind power plant is a remarkable event to get a great concern of many people, because it has been observed as a first case of combining the new large different generating sources, i. e. hybrid diesel-wind power system. This paper is dealing with the analysis of this problem and with the grid-coordination. The first endeavor of actual measenment was performed at site during October 18-21. 2DO and a part of this records is presented in this paper. It is well known that the power qualification of Ullung island is poor than peninsular continent, and the deviation of frequency is rather big. Moreover, it is easily assumed that the frequency pulsation from the power impact of wind power can add to the originally existing frequency pulsation, however the situation can be improved greatly, if a proper adjustment on diesel apparatus can be adopted.
오철수 한국에너지학회 1995 에너지공학 Vol.4 No.3
다리우스 풍력터빈의 속도설정을 터빈이 만드는 토크와 발전기가 요구하는 토크의 \평형을 통해 찾아 낼 수 있음을 검토하였다. 풍속에 따른 속도-토크곡선에서 일정충력곡선이 만나는 점이 터빈의 동작점으로 되며 이는 안정 및 불안정이 될 수도 있다. 풍속과 출력이 각각 변할 때 이 동작점이 어떻게 이동되는가 하는 점을 제시하였다. 또한 터빈의 속도에 관한 제어 블록선도를 제시하여 그 출력변화에 따른 속도변화의 전달함수를 알아내고 이의 형태는 1차 시지연 함수로 유도된다.