http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
김승민(Seungmin Kim),윤석문(Seokmoon Yoon),홍성진(Seongjin Hong),최준혁(Junehyug Choi),이주현(Joohyun Lee),육심균(Simkyun Yook) 대한기계학회 2010 대한기계학회 춘추학술대회 Vol.2010 No.11
Most control systems for boilers, turbines and generators, which are the main components of thermal power plants, consist of imported different types of platforms in South Korea. To improve the control efficiency and convenience of maintenance, an integrated monitoring and control system which is based on a single platform, has been developed in South Korea since 2007. The functional verification for the developed prototype product is an indispensable item in the development process, and it is one of the steps to make a brand new control system. In this paper, we introduce the key design specifications and functions of the integrated controller for controlling and monitoring boilers, turbines and generators. We also present the test results, procedures and methods of inspection for the prototype control system to meet the design specifications.