http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
이택승,박병기,남궁희정,김동원 전북대학교 공업기술연구소 1992 工學硏究 Vol.23 No.-
Developed in this paper is and aggregate production planning model for the concrete products industry. An L.P. model is formulated whose objective is to minimize the total cost of production during the planning horizon. This model considers basically both the constraints of the mixed production and the characteristics of the cost function. A case example is included for the model validation check. Results of the study indicate that this Kind of production planning would be well used for a guide line of the real production.