RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • Syngas 조성이 가스터빈의 작동특성에 미치는 영향

        김영식(Y. S. Kim),김동섭(T. S. Kim),손정락(J. L. Sohn),김시문(S. M. Kim) 대한기계학회 2009 대한기계학회 춘추학술대회 Vol.2009 No.5

        In IGCC plants, operating characteristics of a gas turbine change due to design options such as the integration between the gasification process and the gas turbine. Problems of compressor surge margin reduction and turbine metal overheating may occur in low integration degree region. The syngas composition also affects the gas turbine operation. According to gasification process and kinds of coal, syngas compositions vary. Moreover, when carbon capture and storage is applied to the gasification process, syngas composition changes very much. This study examines the influence of syngas composition on the operating characteristics of a gas turbine. Four different syngases are considered as fuels of a gas turbine. As the heating value of syngas gets lower, the problems of surge margin reduction and metal overheating become worse. It is suggested that according to each syngas composition, integration degree of gas turbine and gasification process should be designed differently.

      • 〈논문〉 IGCC 운전감시시스템

        주용진(Y. J. Joo),김시문(S. M. Kim),이민철(M. C. Lee),정재화(J. H. Chung) 대한기계학회 2008 대한기계학회 춘추학술대회 Vol.2008 No.5

        Integrated Gasification Combined Cycle (IGCC) technology is a power generation process that integrates a gasification system with a combined cycle power plant. This present paper describes concepts of the real-time operation monitoring system as a tool for enhancing the reliability and raising the availability of the first Korea IGCC power plant. This system consists of five (5) modules : (1) Data Validation Module, (2) Performance Calculation Module (3) Performance Diagnostic Module, (4) Trip Information Module, and (5) Statistics Analysis Module. The objective of this system is to achieve the optimum level of operational performance by providing the operation information of the entire power plant and its major components in real-time and on-line.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼