RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Building Integrated Vegetation Systems into the New Sainsbury's Building Based on BIM

        Lee, Dong-Kyu Korean Institute of Building Information Modeling 2014 KIBIM Magazine Vol.4 No.2

        Today, there is a growing need of environment-friendly buildings, so-called 'green', facilities, and energy saving buildings to decrease environmental pollutants released into cities by construction activities. Green-Building Information Modeling (Green-BIM) is a purpose-built solution which supports to forecast energy consumption of 3-D model of a building by augmenting its primary 3-D measurements (width, height and depth) with many more dimensions (e.g. time, costs, social impacts and environmental consequences) throughout a series of sequential phases in the lifecycle of a building. The current study was carried out in order to integrate vegetation systems (particularly green roof and green wall systems) and investigate thermal performance of the new Sainsbury's building which will be built on Melton road, Leicester, United Kingdom. Within this scope, a 3-D building model of the news Sainsbury's building was first developed in $Autodesk^{(R)}$ $Revit^{(R)}$ and this model was then simulated in $Autodesk^{(R)}$ $Ecotect^{(R)}$once weather data of the construction site was obtained from $Autodesk^{(R)}$ Green Building $Studio^{(R)}$. This study primarily analyzed data from (1) solar radiation, (2) heat gains and losses, and (3) heating and cooling loads simulation to evaluate thermal performance of the building integrated with vegetation system or conventionally available envelops. The results showed that building integrated vegetation system can potentially reduce internal solar gains on the building rooftops by creating a 'bioshade'. Heat gains and losses through roofs and walls were markedly diminished by offering greater insulation on the building. Annual energy loads for heating and cooling were significantly reduced by vegetation more significantly through the green roof system in comparison to green wall system.

      • KCI등재

        BUILDING INFORMATION MODELING (BIM)-BASED DESIGN OF ENERGY EFFICIENT BUILDINGS

        Cho, Chung-Suk,Chen, Don,Woo, Sungkwon Korean Institute of Building Information Modeling 2012 KIBIM Magazine Vol.2 No.1

        With the increased awareness of energy consumption as well as the environmental impact of building operations, architects, designers and planners are required to place more consideration on sustainability and energy performance of the building. To ensure most of those considerations are reflected in the building performance, critical design decisions should be made by key stakeholders early during the design development stage. The application of BIM during building energy simulations has profoundly improved the energy analysis process and thus this approach has gained momentum. However, despite rapid advances in BIM-based processes, the question still remains how ordinary building stakeholders can perform energy performance analysis, which has previously been conducted predominantly by professionals, to maximize energy efficient building performance. To address this issue, we identified two leading building performance analysis software programs, Energy Plus and IES <Virtual Environment> (IES <VE>), and compared their effectiveness and suitability as BIM-based energy simulation tools. To facilitate this study, we examined a case study on Building Performance Model (BPM) of a single story building with one door, multiple windows on each wall, a slab and a roof. We focused particularly on building energy performance by differing building orientation and window sizes and compared how effectively these two software programs analyzed the performance. We also looked at typical decision-making processes implementing building energy simulation program during the early design stages in the U.S. Finally, conclusions were drawn as to how to conduct BIM-based building energy performance evaluations more efficiently. Suggestions for further avenues of research are also made.

      • KCI등재

        LEED Certification and Its Effectiveness on Urban Heat Island Effect

        Kim, Hwan-Yong,Gu, Dong-Hwan Korean Institute of Building Information Modeling 2015 KIBIM Magazine Vol.5 No.4

        The Leadership in Energy and Environmental Design (LEED) has provided abundant resources and guidelines for a new project to become a sustainable anchor in the neighborhood. Paired with a range of checklist, LEED has strong influence on the standards for a sustainable building, and it also has played an iconic role in energy-efficient architecture. However, it is still unclear as to whether or not an LEED certified building enhances environmental benefits to its surroundings. If an LEED certification promises a baseline for an eco-friendly building, then a group of these structures should ensure significant environmental benefits to the society. This is the main question of this study, and the authors answer this hypothesis by examining the relationship of LEED certificates and their influence on outdoor temperature, especially in terms of urban heat island effect. The goal of this paper is to analyze the influence of the LEED certification on urban temperature as an indicator of sustainable architecture's regional interactions. If an LEED certificate is regarded as a strong contributor to a sustainable built environment, then a group of these certificates should result in greater benefits to society. To this extent, the authors question if there is any possible relationship between a large concentration of LEED certified sites and the temperature of their surroundings. To properly assess the research direction, Global Moran's I analysis, Local Moran's I analysis, and Hot Spot analysis are implemented to find the clustered areas of LEED certified buildings. For examining relationships between clustered area and its temperature, correlation efficients are calculated.

      • KCI등재

        3D Earthwork BIM Design Process for a Road Project

        Raza, Hassnain,Park, Sang-Il,Lee, Seung Soo,Tanoli, Waqas Arshad,Seo, Jongwon Korean Institute of Building Information Modeling 2017 KIBIM Magazine Vol.7 No.2

        Building Information modeling is playing an important role in transforming the construction industry. It helped the industry with better visualization, minimum design errors, and excellent planning of the construction activities. Time and cost saving can be effectively achieved by using BIM for any construction project. It improves information exchange between all the project stakeholders. However, the development of earthwork 3D BIM is still underway and has not been fully implemented yet. This paper presents the study of a complete process for Earthwork BIM design using Autodesk Civil 3D. A real site road construction project is used as a case study to explain the process of earthwork modeling, starting from laser scanning to 3D model. Quantity take off calculation is very important part of any road construction project so during this study earthwork volume from two 3D earthwork model is calculated. The results obtained through this study will be the basis for future work which has been concluded in this paper.

      • KCI등재

        BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client

        함남혁,김웅기,김재준,Ham, Nam-Hyuk,Kim, Woong-Gi,Kim, Jae-Jun Korean Institute of Building Information Modeling 2020 KIBIM Magazine Vol.10 No.3

        From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

      • KCI등재

        ENERGY ANALYSIS UTILIZING BIM FOR ZERO NET ENERGY TEST HOME

        Cho, Yong K. Korean Institute of Building Information Modeling 2012 KIBIM Magazine Vol.2 No.2

        This paper presents the results of a theoretical energy analysis of a research test bed called the Zero Net Energy Test House (ZNETH) in Omaha, Nebraska in U.S.A. The ZNETH project is being designed and built with the goal of consuming a negligible amount of energy by offsetting remaining usage after energy conservation. The theoretically consumed and generated energy levels were analyzed using energy modeling software programs. By integrating a highly graphical and intuitive analysis with a Building Information Model(BIM) of the house, this investigation introduces strategies to include sustainable materials and systems to predict energy generation with a case study of ZNETH. In addition, this paper introduces parametric analyses for better envelope design and construction material selection by analyzing simulated energy consumption with various parametric inputs, e.g., material types, location, and size. It was found that the current design of ZNETH does not meet its goal of zero net energy. Sugeestions are presented to assist ZHETH in meeting its net zero energy goal.

      • KCI등재

        Web-based Collaboration Systems for Structural Design: A Review

        Lim, Jinkang,Lee, Jaewook,Lee, Seunghye,Kim, Han Soo,Jung, Sungwon Korean Institute of Building Information Modeling 2015 KIBIM Magazine Vol.5 No.4

        In a construction project, collaboration amongst the project participants is a critical factor for high-quality results and successful completion of the project. Owing to the advance of information technologies, web-based systems have become more common in the construction industry, but research and development has been made for only limited areas. For organized and systematic collaboration in various fields, collaboration systems have to be developed in a holistic manner based on diverse needs from the whole construction industry. This study aims to investigate the current status of web-based collaboration systems from structural engineers' perspectives and propose an improvement plan. For a systematic analysis of selected cases, we apply a classification of three developmental stages depending on interoperability and organizational levels: structural design and analysis, collaborative design, and integrated design management. Thereafter, the characteristics of each stage are extracted and comparatively analyzed. Lastly, three functional factors were proposed for the improvement of web-based collaboration systems for structural design.

      • KCI등재

        Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

        Kim, JongHoon,Cohen, Fernando Castillo Korean Institute of Building Information Modeling 2015 KIBIM Magazine Vol.5 No.4

        This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼