http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
A Study on the Allowable Range of Overhanging Berthing at the Port of Ulsan
Seungyeon Kim,Yongung Yu,Yunsok Lee 해양환경안전학회 2019 海洋環境安全學會誌 Vol.25 No.3
As vessels become larger and competition between ports intensifies, there has been an increase in the number of cases where vessels that exceed the available berths are berthed at the pier. Therefore, there has been an increase in the number of cases in which the bow or stern of a ship is projected and moored. The risk of overhanging berthing is that mooring safety can be compromised because it is not possible to connect the bow and stern mooring line to the ship properly. In addition, collision accidents may occur between moving vessels if the view of a vessel moving in the port is obstructed. Therefore, in this study, the simulation of mooring safety was performed according to the overhanging range in Piers No. 6 and 7 in Ulsan’s main port to propose the overhanging limit and operational standards according to each ship. As a result of the assessment, 30,000 DWT bulkers are able to overhang up to 0.75B, and 50,000 DWT bulkers can overhang up to 0.50B. The results of this study are expected to be used as basic data for setting the allowable overhang limit, as well as clear usage criteria for safe unloading operations.
A Study on the Allowable Range of Overhanging Berthing at the Port of Ulsan
Kim, Seungyeon,Yu, Yongung,Lee, Yunsok The Korean Society of Marine Environment and safet 2019 海洋環境安全學會誌 Vol.25 No.3
As vessels become larger and competition between ports intensifies, there has been an increase in the number of cases where vessels that exceed the available berths are berthed at the pier. Therefore, there has been an increase in the number of cases in which the bow or stern of a ship is projected and moored. The risk of overhanging berthing is that mooring safety can be compromised because it is not possible to connect the bow and stern mooring line to the ship properly. In addition, collision accidents may occur between moving vessels if the view of a vessel moving in the port is obstructed. Therefore, in this study, the simulation of mooring safety was performed according to the overhanging range in Piers No. 6 and 7 in Ulsan's main port to propose the overhanging limit and operational standards according to each ship. As a result of the assessment, 30,000 DWT bulkers are able to overhang up to 0.75B, and 50,000 DWT bulkers can overhang up to 0.50B. The results of this study are expected to be used as basic data for setting the allowable overhang limit, as well as clear usage criteria for safe unloading operations.