RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재후보

        A Study of the PDCA and CAPD Economic Designs of the x Control Chart

        Jing Sun,Michiko Tsubaki,Masayuki Matsui 대한산업공학회 2007 Industrial Engineeering & Management Systems Vol.6 No.1

        The PDCA (Plan, Do, Check and Act) cycle is often used in the field of quality management. Recently, business environments have become more competitive, and the due time of products has shortened. In a short production run process, to increase efficiency of management, the necessity for distinguishing the PDCA design that starts with PLAN and the CAPD design that starts with CHECK has been clarified. Starting from Duncan (1956), there have been a number of papers dealing with the economic design of control charts from the viewpoint of production run. Some authors (Gibra, 1971; Ladany and Bedi, 1976; etc.) have studied the economic design for finite-length runs; other authors (Crowder, 1992; Del Castillo and Montgomery, 1996; etc.) have studied the economic design for short runs. However, neither the PDCA nor the CAPD design of control charts has been considered. In this paper, both the PDCA and CAPD designs of the x chart are defined based on Del Castillo and Montgomery’s design (1996), and their mathematical formulations are shown. Then from an economic viewpoint, the optimal values of the sample size per each sampling, control limits width, and the sampling interval of the two designs are studied. Finally, by numerically analyzing the relations between the key parameters and the total expected cost per unit time, the comparisons between the two designs are considered in detail.

      • SCOPUSKCI등재

        A Study of the PDCA and CAPD Economic Designs of the $\bar{x}$ Control Chart

        Sun, Jing,Tsubaki, Michiko,Matsui, Masayuki Korean Institute of Industrial Engineers 2007 Industrial Engineeering & Management Systems Vol.6 No.1

        The PDCA (Plan, Do, Check and Act) cycle is often used in the field of quality management. Recently, business environments have become more competitive, and the due time of products has shortened. In a short production run process, to increase efficiency of management, the necessity for distinguishing the PDCA design that starts with PLAN and the CAPD design that starts with CHECK has been clarified. Starting from Duncan (1956), there have been a number of papers dealing with the economic design of control charts from the viewpoint of production run. Some authors (Gibra, 1971; Ladany and Bedi, 1976; etc.) have studied the economic design for finite-length runs; other authors (Crowder, 1992; Del Castillo and Montgomery, 1996; etc.) have studied the economic design for short runs. However, neither the PDCA nor the CAPD design of control charts has been considered. In this paper, both the PDCA and CAPD designs of the $\bar{\x}$ chart are defined based on Del Castillo and Montgomery's design (1996), and their mathematical formulations are shown. Then from an economic viewpoint, the optimal values of the sample size per each sampling, control limits width, and the sampling interval of the two designs are studied. Finally, by numerically analyzing the relations between the key parameters and the total expected cost per unit time, the comparisons between the two designs are considered in detail.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼