RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Multi-time Scale Coordinated Optimization of New Energy High Permeability Power System Considering Flexibility Requirements

        Su Shiwei,Tan Donghong,Li Xianghua,Li Xin,Chen Zitong,Lian Ruiqing,Lenz Soronga Blaise Kevine 대한전기학회 2023 Journal of Electrical Engineering & Technology Vol.18 No.2

        The high proportion of grid-connected intermittent energy such as wind power and photovoltaic makes the demand for power system flexibility increase sharply. In order to improve the overall flexibility of new energy high permeability system and enhance the economy of power system, promote the new energy consumption of system. This paper presents a multi-time scale Coordinated optimization strategy for the new energy high permeability power system considering flexibility requirement (MTSCOSFR). This strategy makes full use of the adjustment ability of source-load-storage flexible resources and analyzes system flexibility requirements at different time scales, creates multi-time scale optimization scheduling models, including typical week operation simulation model, typical day operation simulation model, typical period operation simulation model. Puts the profit of carbon trading and the penalty cost of insufficient flexibility into the optimization goal. Adopts the idea of multi-time coordination and step-by-step optimization to solve the model. This paper sets two cases to discuss MTSCOSFR. The results show that the comprehensive cost of the typical weekly operation simulation is reduced to 2360 × 104$, the penalty cost of insufficient flexibility in the typical day operation simulation is reduced by 67%, the flexibility capacity increased by 500 MW, the regulation capacity increased by 300 MW, the ramp margin increased by 1500 MW/(5 min) −1. The proposed strategy can improve system flexibility and promote new energy consumption on the basis of ensuring system economy.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼