http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
CONSTRUCTION, ASSEMBLY AND COMMISSIONING OF KSTAR MAIN STRUCTURES
HYUNG-LYEOL YANG,JOO-SHIK BAKa,BYUNG-CHUL KIM,CHANG-HO CHOI,WOONG-CHAE KIM,NAM-IL HER,KWON-HEE HONG,GEUNG-HONG KIM,HAK-KUN KIM,JEONG-WOO SA,HONG-TACK KIM,KYUNG-MIN KIM,SANG-TAE KIM,DONG-JIN KIM,KWANG- 한국원자력학회 2008 Nuclear Engineering and Technology Vol.40 No.6
The KSTAR device succeeded in first plasma generation on 13th June of 2008 through comprehensive system test and commissioning. Among various kinds of the key factors that decisively affected the project, success in the construction and assembly of the major tokamak structure was most important one. Every engineering aspects of each structure were finally confirmed in the integrated commissioning period, and there were no severe troubles and failures prevented the KSTAR device from operating during the commissioning and the first plasma experiments. As a result, all of the experiences and technologies achieved through the KSTAR construction process are expected to be important fundamentals for future construction projects of superconducting fusion devices. This paper summarizes key engineering features of the major structures and of the machine assembly.