http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Rashidi, Babak,Shirangi, Ehsan,Baymaninezhad, Matin Techno-Press 2018 Wind and Structures, An International Journal (WAS Vol.26 No.2
Nowadays, using math logic in great civil projects is considered by the clients to achieve the goals of project including quality optimization, costs, avoiding individual, emotional and political decision making, long-term and short-term goals and they are the main requirements of each project and should be considered by the decision makers to avoid the illogical decision making applied on the majority of civil projects and this imposes great financial and spiritual costs on our country. The present study attempts to present one of the civil projects (Ghasre Shirin storage dam) whose client was not ministry of energy for the first time and the short-term and long-term goals of the private sector were applied based on the triangle of quality, cost and time. Also, the math logic and model (multi-criteria decision making method and decision making matrix) is used in one of the most important sections of project, sealing element, policies and new materials (Geosynthetics) are considered and this leads to suitable decision making in this regard. It is worth to mention that this method is used for other sections of a dam including body, water diversion system, diaphragm and other sectors or in other civil projects of building, road construction, etc.
Babak Rashidi,Ehsan Shirangi,Matin Baymaninezhad 한국풍공학회 2018 Wind and Structures, An International Journal (WAS Vol.26 No.2
Nowadays, using math logic in great civil projects is considered by the clients to achieve the goals of project including quality optimization, costs, avoiding individual, emotional and political decision making, long-term and short-term goals and they are the main requirements of each project and should be considered by the decision makers to avoid the illogical decision making applied on the majority of civil projects and this imposes great financial and spiritual costs on our country. The present study attempts to present one of the civil projects (Ghasre Shirin storage dam) whose client was not ministry of energy for the first time and the short-term and long-term goals of the private sector were applied based on the triangle of quality, cost and time. Also, the math logic and model (multi-criteria decision making method and decision making matrix) is used in one of the most important sections of project, sealing element, policies and new materials (Geosynthetics) are considered and this leads to suitable decision making in this regard. It is worth to mention that this method is used for other sections of a dam including body, water diversion system, diaphragm and other sectors or in other civil projects of building, road construction, etc.
Role of suprascapular nerve block in idiopathic frozen shoulder treatment: a clinical trial survey
Mohsen Mardani-Kivi,Bahram Naderi Nabi,Mir-Hashem Mousavi,Ardeshir Shirangi,Ehsan Kazemnejad Leili,Zahra Haghparast Ghadim-Limudahi 대한견주관절학회 2022 대한견주관절의학회지 Vol.25 No.2
Background: Several therapeutic methods have been proposed for frozen shoulder syndrome. These include suprascapular nerve block, a simple and cost-effective technique that eliminates the need for nonsteroidal anti-inflammatory drug therapy. Methods: This was a clinical trial that included patients with unilateral shoulder joint stiffness. Patients were divided into three groups: those treated with isolated physiotherapy for 12 weeks (PT group), those treated with a single dose intra-articular injection of corticosteroid together with physiotherapy (IACI group), and those treated with a suprascapular nerve block performed with a single indirect injection of 8-mL lidocaine HCL 1% and 2 mL (80 mg) methylprednisolone acetate together with physiotherapy (SSNB group). The variables assessed were age, sex, side of involvement, dominant limb, presence of diabetes, physical examination findings including erythema, swelling, and muscle wasting; palpation and movement findings; shoulder pain and disability index (SPADI) score; and the visual analog scale (VAS) score pre-intervention and at 2-, 4-, 6-, and 12-week post-intervention. Results: Ninety-seven patients were included in this survey (34 cases in the PT group, 32 cases in the IACI group, and 31 cases in the SSNB group). Mean age was 48.55±11.06 years. Fifty-seven cases were female (58.8%) and 40 were male (41.2%). Sixty-eight patients had a history of diabetes (70.1%). VAS and SPADI scores and range of mototion degrees dramatically improved in all cases (p<0.001). Results were best in the SSNB group (p<0.001), and the IACI group showed better results than the PT group (p<0.001). Conclusions: Suprascapular nerve block is an effective therapy with long-term pain relief and increased mobility of the shoulder joint in patients with adhesive capsulitis.