RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Seismic vulnerbility analysis of Bankstown’s West Terrace railway bridge

        Olivia Mirza,Sakdirat Kaewunruen,Darren Galia 국제구조공학회 2016 Structural Engineering and Mechanics, An Int'l Jou Vol.57 No.3

        This paper highlights a case study that investigates the behaviour of existing bridge, West Terrace Bridge, induced by horizontal seismic loading. Unfortunately the lack of past information related to seismic activity within the NSW region has made it difficult to understand better the capacity of the structure if Earthquake occurs. The research was conducted through the University of Western Sydney in conjunction with Railcorp Australia, as part of disaster reduction preparedness program. The focus of seismic analyses was on the assessment of stress behaviour, induced by cyclic horizontal/vertical displacements, within the concrete slab and steel truss of the bridge under various Earthquake Year Return Intervals (YRI) of 1-100, 1- 200, 1-250, 1-500, 1-800, 1-1000, 1-1500, 1-2000 and 1-2500. Furthermore the stresses and displacements were rigorously analysed through a parametric study conducted using different boundary conditions. The numerical analysis of the concrete slab and steel truss were performed through the finite element software, ABAQUS. The field measurements and observation had been used to validate the results drawn from the finite element simulation. It was illustrated that under a YRI of 1/1000 the bottom chord of the steel truss failed as the stress induced surpassed the ultimate stress capacity and the horizontal displacement exceeded the allowable displacement measured in the field observations whereas the vertical displacement remained within the previously observed limitations. Furthermore the parametric studies in this paper demonstrate that a change in boundary conditions alleviated the stress distribution throughout the structure allowing it to withstand a greater load induced by the earthquake YRI but ultimately failed when the maximum earthquake loading was applied. Therefore it was recommended to provide a gap of 50mm on the end of the concrete slab to allow the structure to displace without increasing the stress in the structure. Finally, this study has proposed a design chart to showcase the failure mode of the bridge when subjected to seismic loading.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼