http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Case Study on Tunnel Settlement Calculations during Construction Considering Shield Disturbance
Fuxue Sun,Zhouzhou Jin,Chaoliang Wang,Changfei Gou,Xiaochun Li,Cheng Liu,Zheng Yu 대한토목학회 2023 KSCE Journal of Civil Engineering Vol.27 No.5
Shield construction in structural soft soils inevitably disturbs the soil around the tunnel leading to tunnel settlement instead of tunnel uplift due to soil unloading rebound during construction. In this paper, tunnel settlement prediction in structural soft soils during construction has been studied by adopting Oujiang Beikou shield tunnel as an example. Firstly, disturbance degree calculation method based on effective stress was introduced and the disturbance degree due to shield construction was numerically simulated. Secondly, combined with one-dimensional consolidation test results, a “two-fold line” settlement calculation model was developed for disturbed soil. Finally, tunnel settlement during construction was predicted through one-way compression layer-summation method and compared with experimentally measured results. Research results demonstrated that the developed method was suitable for the prediction of shield tunnel settlement in structural soft soils.