http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
金貴植,文一成 제주대학교 공과대학 첨단기술연구소 2005 尖端技術硏究所論文集 Vol.16 No.1
This study is to investgate the possibility of micro hydroelectric power plants by discharged water from DONGBU SEWAGE TREATMENT PLANT located in SEOGWIPO city, Jejudo. The best location for installing the hydropower plant is at the location of EL(+)2.0, the joint owned surface of the water on the west between discharge flow meter chamber and the surface of the sea water. In calculating the quantity of electric power generation, the flowrate used is 0.157m^(3)/sec, the average 95day water flow for the recent 3years. The effective head is 12.41m between discharge flow meter chamber and the location of hydraulic turbine installation. Therefore, the quantity of electricpower generation is expected to be 14.6kW The monthly quantity of electric generation is 9.46MW and the yearly quantity of electric generation is calculated to be 113.53MW The type of hydraulic turbine to be applied to the hydro power generation is the hydraulic turbine of low head miniflow. Therefore, it is recommended to choose an inline-type hydraulic turbine generator. The recommended capacity is 50kW.