http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
MAUT-AHP를 통한 공공건설사업의 통합프로젝트발주방식 효용성 분석
이재섭(Lee Jae-Seob),김우람(Kim Woo-Ram),한진택(Han Jin-Taek),백승목(Paik Seong-Mok),전호준(Jeon Ho-Joon),최기훈(Choi Ki-Hoon) 대한건축학회 2010 大韓建築學會論文集 : 構造系 Vol.26 No.9
Recently, the Integrated Project Delivery(IPD) based on cooperation and synthesis has been expected to improve the efficiency of construction industry. However, it is very difficult to apply the IPD to the public construction projects in Korea due to misunderstanding of the IPD and rigidity of delivery system. This study, therefore, analyzes the utility of IPD as a new delivery system through MAUT-AHP based on a survey. Utilizing the results of analysis, this study makes some suggestions for the application of IPD to public construction industry. The suggestions were made by analyzing the fundamental concept of IPD and the domestic institutional issues in construction industry.
이재섭(Lee, Jae-Seob),한진택(Han, Jin-Taek),백승목(Paik, Seong-Mok),김우람(Kim, Woo-Ram),최기훈(Choi, Ki-Hoon),전호준(Jeon, Ho-Joon) 대한건축학회 2012 大韓建築學會論文集 : 構造系 Vol.28 No.3
Recently, the Integrated Project Delivery(IPD) is based on collaboration and synthesis has been expected to improve the efficiency of construction industry. However, it is very difficult to apply, which the public construction projects in Korea due to misunderstanding of the IPD and rigidity of delivery system. Therefore, this study analyzed restriction factors of IPD to apply on Korea construction industry through survey and experts interview. As a result of analysis, three factors were developed, that is : policies, owners capability, and construction environment. Utilizing the results of analysis for three factors this study makes some suggestions for the application of IPD to Korea construction industry through SWOT analysis.