전문건설업체(專門建設業體)의 업무관리절차(業務管理節次) 개선(改善)에 관한 연구(硏究) -공사단계별(工事段階別) 도장공사(塗裝工事) 참여(參與)를 중심(中心)으로-
송천수 ( Chun Soo Song ),임상모 ( Sang Mo Lim ),조형근 ( Hyung Keun Cho ) 한국건축시공학회 2003 한국건축시공학회 학술발표대회 논문집 Vol.3 No.1
Recently, as changing construction environment, we have come to need rational systematic and transparent in construction industry. In other to consider application possibility of CM in specialty construction, in this study improvement of procedure management by several construction phases in the coating with paint work.
도장공사의 업무관리절차 개선에 관한 연구 : 도장공사의 공정관리 개선을 중심으로
임상모,조형근 호남대학교산업기술연구소 2002 산업기술연구논문집 Vol.10 No.-
최근 급변하는 건설환경 속에서 건설업체의 기능의 분화, 전문화 등이 CM도입 추세에 맞춰 더욱 가속화 되고 있는 실정이다. 이에 본 연구에서는 전문 건설업종 중의 하나인 도장공사에 있어서의 CM 개념을 도입한 업무관리 절차 개선에 따른 공정조정 및 개선을 통해 도장공사의 원가절감 효과를 도모하였다. Recently, as changing construction environment, we have come to need rational systematic and transparent in construction industry. In other to consider application possibility of CM in specialty construction, the coating with paint work. After analyzed construction schedule as the time management, etc executed the time schedule and prime cost analysis which leads the business improvement against.
임상모,조형근 호남대학교 2001 호남대학교 학술논문집 Vol.22 No.2
As changing construction environment, we have come to need rational, systematic and transparent in construction industry. Recently, MOCT (Ministry of Construction & Transportation) in Korea has announced the relation laws and policies regarding an introduction of CM(Construction Management) system and operation plan. In the future, the production method of construction industry in the large scale construction companies, the middle size construction companies, and the specialty and small size construction companies become to change with the cooperation relationship which is more strongly and friendly. In this study, observe the character and role of construction industry. In order to consider application possibility of CM. After analyzed construction schedule as the time management, quality management, and the safety management, etc in the selected construction site, executed the time schedule and prime cost analysis which leads the business improvement against.