http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
장수명 공동주택 실용화를 위한 실험주택 공정분석에 관한 연구
홍성욱(Hong Seong-Wook),박승환(Park Seung-Hwan),김상원(Kim Sang-Won),안진경(An Jin-Kyung),손창백(Son Chang-Baek),이두진(Lee Doo-Jin),이명광(Lee Meoung-Kwang) 대한건축학회 2009 大韓建築學會論文集 : 構造系 Vol.25 No.7
Mock-up house has been analyzed based on the construction planning and scheduling for practicality of long life housing. The conclusion of the study are addressed as follows. In Support system, the working period of 1 cycle in apartment which was adjusted to FPWS(Flat Plate Wall System) has been decreased to 2 days, and the working period in long life housing has been decreased to 1 day than that was adjusted to bearing wall system (7days). In case of Infill system, the working period in apartment which was adjusted to FPWS(Flat Plate Wall System) has been decreased to 2 days, and the working period in long life housing has been decreased to 9 days than that was adjusted to bearing wall system (30days). The main reason for decreased period might be accepted that the Infill system was taken dry-ondol method process for flooring construction.