CBP 시장에서 OPF를 활용한 송전설비계획에 관한 연구
한석만(Seok-Man Han),김광모(Kwang-Mo Kim),정구형(Koo-Hyung Chung),김발호(Balho H. Kim) 대한전기학회 2006 대한전기학회 학술대회 논문집 Vol.2006 No.7
This paper proposed the transmission planning mechanism in competitive power markets. This mechanism used Optimal Power Flow (OPF) to calculate operation cost and Contingency Constrained OPF (CC-OPF) to consider N-1 contingency outage. In addition, this algorithm deduced a yearly transmission planning using Dynamic Programming (DP).
다기준 의사결정 모형을 이용한 전력수급계획 모형에 관한 연구
한석만(Seok-Man Han),김발호(Balho H. Kim) 대한전기학회 2009 전기학회논문지 Vol.58 No.3
The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning can't use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi-criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.
경쟁시장 체제하에서의 전력수급계획 수립 체계에 관한 연구
한석만(Seok-Man Han),김강원(Kang-Won Kim),김태영(Tae-Young Kim),이정인(Jeong-In Lee),김발호(Balho H. Kim) 대한전기학회 2008 대한전기학회 학술대회 논문집 Vol.2008 No.11
The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning not used cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning process in the power markets. This system is composed of Regulator and GENCO's model. Regulator model used multi-criteria decision making rule. GENCO model is very complex problem. Thus, this system transacted the part by several scenario assuming GENCO model.
韓錫萬(Seok-Man Han),金發鎬(Balho H. Kim) 대한전기학회 2008 전기학회논문지 Vol.57 No.9
In the past vertically integrated power system, the power utility forecasted power demand and invested new power plants to keep a system adequacy. However, in the competitive electricity markets, a principle part of the capacity investment is market participants who decided the investment to maximize their profit. Especially, one of the main factors in their long-term decision making is the retrieval of fixed costs (construction costs). This paper presents the capacity payment in electricity power markets. The capacity payment (CP) in Cost Based Pool (CBP) is needed to recover fixed costs. However, CP in CBP was applied not only recovering fixed costs but also ensuring supply reliability. In order to operate harmonious power markets, pool needs reasonable CP mechanism. This paper analysis CP using capacity proportion and Reliability Pricing Model (RPM).
한석만,Han, Seok-Man 한국화재보험협회 2006 防災와 保險 Vol.114 No.-
국제화재안전기준(NFSC)은 현행 소방법규를 탄력적으로 적용하고, 민간의 다양한 소방기술을 용이하게 번영하기 위한 것이다. 이의 발전을 위해서는 다양한 민간기준의 개발과 활용이 필수적이다. 국내외 민간화재안전기준의 현황과 화재 및 관련 위험들에 대한 민간화재안전기준의 발전 방향 등에 대해 알아본다.
다기준 의사결정 모형을 이용한 전력수급계획 모형에 관한 연구
한석만(Seok-Man Han),강동주(Dong-Joo Kang),김광모(Kwang-Mo Kim),홍희정(Hee-Jung Hong),김발호(Balho H. Kim) 대한전기학회 2008 대한전기학회 학술대회 논문집 Vol.2008 No.11
The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost However, the planning not used cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi - criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.