RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        On the Preliminary Structural Design Strategy of the Wing of the Next-Generation Civil Tiltrotor Technology Demonstrator

        Marika Belardo,Jacopo Beretta,Aniello Daniele Marano,Gianluca Diodati,Nicola Paletta,Luigi Di Palma 한국항공우주학회 2021 International Journal of Aeronautical and Space Sc Vol.22 No.3

        The T-WING project is a Clean Sky 2 research project aimed at designing, manufacturing, qualifying and flight-testing the new wing of the Next-Generation Civil Tiltrotor Technology Demonstrator (NGCTR-TD), as part of the Fast Rotorcraft Innovative Aircraft Demonstrator Platforms (FRC IADP) activities. Requirements, design strategy, methodology and main steps followed to achieve the composite wing preliminary design are presented. The main driving requirements have been expressed in terms of dynamic requirements (e.g., limitations on natural frequencies), aeroelastic requirements, i.e., compliance with European Aviation Safety Agency (EASA) CS-25 and CS-29 Airworthiness Requirements), structural requirements (e.g., target wing structural mass), functional requirements (e.g., fuel tanks, accessibility, assembly and integration, etc.) and wing preliminary loads. Based on the above-mentioned requirements, the first design loop is performed by targeting an optimal wing structure able to withstand preliminary design loads, and simultaneously with stiffness and inertia distributions leading to a configuration free from flutter within the flight envelope. The outcome from the first design loop is then used to refine the model and compute more reliable flight loads and repeat aeroelastic analysis, returning further requirements to be fulfilled in terms of wing stiffness and inertia distributions. The process is iterated till the fulfillment of all the project requirements.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼