http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
The study on the difference of mechnical fators between 2D and 3D Tunnel Modelling
Byung-Suk Lee(이병석),Mohammad Taimur Tanvir (모하마드 테이므르 탄빌),Jea-Min KO(고재민) 한국산학기술학회 2015 한국산학기술학회 학술대회 Vol.2015 No.1
One of the major objectives of the tunnel analysis is to figure out the stability of the given design and the adequacy of the construction process. By processing numerical analysis, we can distinguish the displacement and subsidence which arise around the tunnel before tunnel construction. Also we can comprehensively analyze stress of shotcrete and rockbolts to predict in advance problems during construction.