RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Evaluation of in-situ stress state along the shotcrete lined high-pressure headrace tunnel at a complex Himalayan geological condition

        Basnet Chhatra Bahadur,Panthi Krishna Kanta 한국자원공학회 2021 Geosystem engineering Vol.24 No.1

        The Himalayan region is renowned with its complex topography and active tectonic movement, which causes accumulation and sudden release of strain energy instigating changes in the in-situ stress state. This paper evaluates in-situ stress state at the Upper Tamakoshi Hydroelectric Project where shotcrete lined headrace tunnel with considerable hydrostatic head is being implemented. Start of the pressure tunnel at the downstream-end was proposed inside slope topography of about 300 m above valley bottom based on in-situ stresses measured by 3D overcoring at the test tunnel located at valley level. It was believed that pressure tunnel start location with a hydrostatic head of 420 m was inferred to have almost similar in-situ stress state measured at the test tunnel. However, minimum principal stresses measured by hydraulic fracturing were found insufficient to avoid hydraulic jacking. This manuscript evaluates in-situ stress state of the area and explores reasons behind much lower stresses than expected. Detailed assessment of the stress state using both measured data and 3D numerical analysis is performed, which revealed that the stress state has high degree of spatial variation even at similar overburden conditions. The analysis further demonstrates that presence of local shear zone has considerable de-stressing effect.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼