http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
건설VE에서의 준비단계와 분석단계 연계방안에 관한 연구
손석구,현창택,구교진 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
Value Engineering(VE) is in force for strengthening the competitiveness in internal construction industry. But, although there are systematic, technical efforts, VE is recognized only a method of cost saving in internal construction industry. Each phase of VE has not been connected organically and cut. It has focused only cost saving in target selection phase and function definition has been performed by original functions that target has. This study suggests the connection process between a target selection of preparation phase and a function definition of analysis phase, and reflects needs of clients and users and project characters in the target selection. This study suggests a method of an effective function definition