http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
강석구(Kang, Sok-Kuh),이광수(Lee, Kwang-Soo),박진순(Park, Jin-Soon),염기대(Yum, Ki-Dai),정경태(Jung, Kyung-Tae),장찬주(Jang, Chan-Joo) 한국신재생에너지학회 2007 신재생에너지 Vol.3 No.2
Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.
강석구(Kang, Sok-Kuh),이광수(Lee, Kwang-Soo),박진순(Park, Jin-Soon),염기대(Yum, Ki-Dai) 한국신재생에너지학회 2007 한국신재생에너지학회 학술대회논문집 Vol.2007 No.06
Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.
Tidal regime change due to the Siwha tidal power plant operation in the Yellow and East China Seas
강석구(Kang, Sok-Kuh),염기대(Yum, Ki-Dai),이광수(Lee, Kwang-Soo),장찬주(Jang, Chan-Joo),박진순(Park, Jin-Soon) 한국신재생에너지학회 2006 한국신재생에너지학회 학술대회논문집 Vol.2006 No.06
The feasibility study for tidal power plant (TPP) has been carried out for the Siwha area inside the Kyunggi bay of the Kyunggi Bay of the Yellow and East china Seas, by KORDI (Korea Ocean Research and Development Institute) and continuing research works for tidal energy development are under progress in the several sites inside the Kyunggi Bay. In this paper we describes some results of the modeling efforts in relation the tidal regime change by Siwha TPP operation, as well as other coastal oceanographic research works involved in TPP development in the coastal region.
강석구(Kang, Sok Kuh),염기대(Yum, Ki-Dai),이광수(Lee, Kwang Soo),박진순(Park, Jin Soon) 한국신재생에너지학회 2005 신재생에너지 Vol.1 No.2
The pilot tidal current power plant is to be constructed at the Uldolmok between Chindo and Haenam, during next year, and extensive coastal engineering research works have been carried out. In this paper we describes some observation results of the tide and tidal current, as well as modeling work in order to investigate the tide and tidal current regime change In relation to the tidal current power plant [TCPP] construction. The special modeling skill in order to consider the turbine operation in the TCPP is developed and applied to the estimation for the flow regime change by the simple layout of the tidal current power plant.
염기대(Yum, Ki-Dai),이광수(Lee, Kwang Soo),박진순(Park, Jin Soon),강석구(Kang, Sok Kuh) 한국신재생에너지학회 2005 한국신재생에너지학회 학술대회논문집 Vol.2005 No.06
The pilot tidal current power plant is to be constructed at the Uldolmok between Chindo and Haenam, during next year. and extensive coastal engineering research works have been carried out. In this paper we describes some observation results of the tide and tidal current. as well as modeling work in order to investigate the tide and tidal current regime change in relation to the tidal current power plant (TCPP) construction. The special modeling skill in order to consider the turbine operation in the TCPP is developed and applied to the estimation for the flow regime change by the simple layout of the tidal current power plant.
이광수(Lee, Kwang-Soo),염기대(Yum, Ki-Dai),박진순(Park, Jin Soon),강석구(Kang, Sok Kuh),박우선(Park, Woo-Sun),한상훈(Han, Sang-Hun),정공일(Jung, Gong-Il),박정우(Park, Jung Woo) 한국신재생에너지학회 2005 한국신재생에너지학회 학술대회논문집 Vol.2005 No.06
The Korean peninsula has a number of coastal sites where the rhythmic rising and lowering of water surface due to tides result in strong tidal current. The kinetic energy of these currents can be efficiently exploited by using tidal current turbines. The pilot tidal current power plant is to be constructed at the Uldolmok between Chindo and Haenam. Extensive coastal engineer ing research works have been carried out. This paper describes some observation results of field campaign, design of the supporting structure of a pilot plant of 1,000kW and a future tidal current power plant and so on.