장석한(Suk-han Jang),유승환(Sung-Hwan Yoo),신명식(Myoung-sik Shin),이규용(Gyu-yong Lee) 대한전기학회 2008 대한전기학회 학술대회 논문집 Vol.2008 No.11
Cheju~Haenam HVDC transmission system start it's commercial operation since 1998. JEJU island is supplied with it's about 45% of total electric power from main land with HVDC link. In JEJU island, the demand of electric power is growing every year. With a current power supply, electric power reserve rate will be below the recommended one. For a stable power supply to JEJU island, KEPCO start a construction of #2 HVDC transmission system. This report is for introduction and understanding of #2 HVDC system which will be installed between JEJU island and main land. This report includes a specification of converter station and DC cable. KEPCO expect that this system will solve the power supply problem and maximum wind power plant capacity problem as well.
〈속보논문〉 가공 송전 철탑기초 설계 및 시공 방법 연구
張石漢(Suk-Han Jang),金熙光(Hee-Kwang Kim),李康現(Kang-Hyeon Lee),韓炅洙(Kyung-Soo Han),咸邦郁(Bang-Wook Ham),丁沂善(Ki-Sun Chung) 대한전기학회 2007 전기학회논문지 Vol.56 No.6
Electric transmission lines pass through a variety of area. Foundation supporting the conductors and tower are selected properly in accordance with external load, for example dead load, wind load, snow load, construction load etc, and topography and geology condition. Typical types of foundation are as follows: pad foundation for small load and hard soil or rock in mountainous area, pile foundation for medium or large load and soft soil in plain field area. This paper introduced cylindrical foundation design & construction for large load and mountainous area. This foundation failure mode against pulling-out show splitting failure by tensile force toward circumferential direction.