http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
성덕룡(Deok-Yong Sung),태성식(Sung-Sik Tae),박광화(Kwang-Hwa Park),강윤석(Sun-Yong Kong),박용걸(Yong-Gul Park) 한국철도학회 2010 한국철도학회 학술발표대회논문집 Vol.2010 No.7
장대레일 교체주기는 자갈궤도 레일두부 표면요철과 레일 휨피로의 상관관계 분석을 통해 산정되었다. 본 연구에서는 실물 레일 휨 피로시험을 통한 레일의 S-N선도, 국내 도시철도(서울메트로) 콘크리트궤도에서 발생하는 레일 휨응력 예측식, Haibach's rule을 통해 콘크리트궤도 장대레일의 휨 피로수명을 평가하였다. 여기서, 레일용접방법별 S-N선도와 레일표면요철, 열차운행속도가 고려되었다. 또한, S-N선도 파괴확률 1%, 0.1%, 0.01%를 고려한 휨 피로수명을 비교하였다. 따라서 본 연구에서는 콘크리트궤도 장대레일의 휨 피로수명을 제안하였다. It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, based on the results of bending fatigue tests of rail and results of measuring tests in situ of rail bending stress, this study estimated the bending fatigue life of welded rail in concrete track, adopting a Haibach's rule. The bending fatigue life of CWR considered the rail surface irregularity, train speed and the S-N curve by types of rail welding. In addition, this study estimated it for the fracture probability 1%, 0.1%, 0.01%. Therefore, this study proposed bending fatigue life of CWR in concrete track.
이일화(Lee Il-Wha),강윤석(Kang Yun-Suk),공선용(Kong Sun-Yong),김상진(Kim Sang-Jin),이순구(Lee Shun-Gu),정연식(Jung Yun-Sik) 한국철도학회 2008 한국철도학회 학술발표대회논문집 Vol.- No.-
Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.