RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
        • 등재정보
        • 학술지명
        • 주제분류
        • 발행연도
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재후보

        제3차 WHO 경혈 위치 국제표준화 회의 보고

        이윤경 ( Yun Kyoung Yim ),강성길 ( Sung Keel Kang ),김용석 ( Yong Suk Kim ),손인철 ( In Chul Sohn ),이혜정 ( Hye Jung Lee ) 대한경락경혈학회 2005 Korean Journal of Acupuncture Vol.22 No.1

        Objective: This report is written to inform of the 3rd WHO Informal Consultation on Development of International Standard Acupuncture Points Locations, held in Kyoto, Japan, on October 12-14, 2004. Results: Eight experts from China, Japan and Korea, participated in this meeting, discussed the Locations and the point finding methods of 92 controversial points based on the fundamental principles established through the 1st and 2nd meetings. Through the discussion in this meeting, agreements were made on most of 92 controversial points, but 8 points(LI12, ST31, PC8, PC9, TE18, LR8, GV1, GV26) still need to be researched in the next meetings. Conclusion: A reasonable and practical International Standard of Acupuncture Point Location for acupuncture education, research and practice is expected to be accomplished in the near future.

      • 커튼월공사의 공기산정 예측모델 개발

        임진호(Yim Jin-Ho),현창택(Hyun Chang-Taek),홍태훈(Hong Tae-Hoon),이윤경(Lee Yun-Kyoung),지성민(Ji Seong-Min) 대한건축학회 2009 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.29 No.1(구조계)

        The research and development of curtain wall construction management are very insufficient due to economic difficulty and imbalance of manpower demand and supply of curtain wall construction enterprises. The theoretical consideration of construction productivity was carried out to suggest a necessity of construction prediction about working days in the domestic construction work, and the necessity of construction period calculation was suggested by understanding the actual condition of the curtain wall construction through characteristics of curtain wall and comparisonㆍanalysis of the present situation. After the working days' prediction method of the existing curtain wall construction was classified into regression analysis, factor analysis and hierarchical multiple regression analysis and considered to establish a prediction model to be suggested in the present study, a regression model process was established by selecting regression analysis as an analysis method using an objective quantified numerical value, and thus the working days' prediction model was built by setting an architectural area, working manpower, the number of total floors as an influence factor affecting major variables of working days' prediction of the curtain wall construction. It is expected that it will be helpful for a curtain wall construction builder to set up a proper construction period through the predicting regression mode in the construction planning stage.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼