- CONTENTS
- Foreword = ⅲ
- Abstract = xv
- Summary = xvii
- 1. Introduction = 1

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
https://www.riss.kr/link?id=M9970709
Washington, D.C.: The Division: Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission; Springfield, Va.: National Technial Information Service, 1980
1980
영어
621.489
일반단행본
Best estimate method vs evaluation method: a comparison of two techniques in evaluating seismic analysis and design : Seismic Safety Margins Research Program / prepared by S.E. Bumpus, J.J. Johnson, P.D. Smith ; prepared for Division of Reactor Safety Research, U.S. Nuclear Regulatory Commission
124 p. in various pagings: ill.; 28 cm.
"Date published: July 1980."
"Lawrence Livermore National Laboratory."
"NRC FIN no. A-0130."
"NUREG/CR-1489."
"UCRL-52746."
GPO item number: 1051-H-11
Includes bibliographical references.
0
상세조회0
다운로드목차 (Table of Contents)