http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Ergonomics and design issues with prill trucks
Torma-Krajewski, J. INSTITUTE OF MINING AND METALLURGY 2007 p.153-157
Lemelin, B.; Abdel Sabour, S.A.; Poulin, R. INSTITUTE OF MINING AND METALLURGY 2007 p.158-166
Development of benchmark stoping widths for longhole narrow-vein stoping
Stewart, P.; Trueman, R.; Lyman, G. INSTITUTE OF MINING AND METALLURGY 2007 p.167-175
Delay timing factor for empirical fragmentation models
Onederra, I. INSTITUTE OF MINING AND METALLURGY 2007 p.176-179
Design methodology for underground ring blasting
Onederra, I.; Chitombo, G. INSTITUTE OF MINING AND METALLURGY 2007 p.180-195
Water reduction investigations on Debswana's diamond mines
Stephenson, D. INSTITUTE OF MINING AND METALLURGY 2007 p.196-200