This study compares and analyzes foreign construction management systems and CM according to the actual conditions of domestic supervision system and the introduction of CM system, draws the problems of supervision system with the engineers and techni...
This study compares and analyzes foreign construction management systems and CM according to the actual conditions of domestic supervision system and the introduction of CM system, draws the problems of supervision system with the engineers and technicians at construction work site and presents the improvement methods.
The service adjustment is required to execute CM service according to the selection of ordering company with the maintenance of current responsible supervision system rather than to replace the current system in consideration of the service, nature and application objects of construction project management system, and the division of construction supervision to the type of consortium with construction company rather than only by supervision company will be desirable.
In addition, faulty work is prevented and competitiveness to foreign construction companies in the time of openness of construction market can be secured by achieving EC(Engineering Construction) function through the unification of designand construction work.
As the developmental stages for the settlement of CM, first package introduction of CM of design and construction work is developed and the service range of CM should be extended with the progress of EC.
And CM type construction method which CM company controls the whole services from the survey of a project validity to final maintenance should be introduced, and in the early period of its introduction, joint venture or consortium with foreign construction companies should be devised and after accumulating know-how, sole CM project should be progressed.
For the successful introduction and development of CM, the cultivation of CMr(Construction Manager) with the handing capacity from project planning to maintenance and management stage is necessary.
The training and cultivation methods of such CMr include overseas field survey for the personnels having rich experiences and know-how and high-level CMr education, education of business administration-centered project control and special education. Also for the cultivation of special CMr, the acquisition of promising foreign qualifications is recommended to overseas construction engineers.