<P><B>Abstract</B></P> <P>As the ITER is being constructed, there is a growing anticipation for an earlier realization of fusion energy. A major design philosophy for the initiated conceptual design study for a steady-st...
http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
https://www.riss.kr/link?id=A107478973
2015
-
SCI,SCIE,SCOPUS
학술저널
281-285(5쪽)
0
상세조회0
다운로드다국어 초록 (Multilingual Abstract)
<P><B>Abstract</B></P> <P>As the ITER is being constructed, there is a growing anticipation for an earlier realization of fusion energy. A major design philosophy for the initiated conceptual design study for a steady-st...
<P><B>Abstract</B></P> <P>As the ITER is being constructed, there is a growing anticipation for an earlier realization of fusion energy. A major design philosophy for the initiated conceptual design study for a steady-state Korean fusion demonstration reactor (K-DEMO) is engineering feasibility. A two-staged development plan is envisaged. K-DEMO is designed not only to demonstrate a net electricity generation and a self-sustained tritium cycle, but also to be used, in its initial stage, as a component test facility. Then, in its second stage, a major upgrade is carried out by replacing in-vessel components in order to show a net electricity generation on the order of 500MWe. After a thorough 0-D system analysis, the major radius and minor radius are chosen to be 6.8m and 2.1m, respectively. In order to minimize wave deflection, a top-launch high frequency (>200GHz) electron cyclotron current drive (ECCD) system will be the key system for the current profile control. For matching the high frequency ECCD, a high toroidal field (TF) is required and can be achieved by using high current density Nb<SUB>3</SUB>Sn superconducting conductor. The peak magnetic field reaches to 16T with the magnetic field at the plasma center above 7T. Key features of the K-DEMO magnet system include the use of two TF coil winding packs, each of a different conductor design, to reduce the construction cost and save the space for the magnet structure material.</P> <P><B>Highlights</B></P> <P> <UL> <LI> Perform a preliminary conceptual study for a steady-state Korean DEMO reactor. </LI> <LI> Present a preliminary design of TF (toroidal field) magnet. </LI> <LI> Present a preliminary design of CS (central solenoid) magnet. </LI> <LI> Present a preliminary design of PF (toroidal field) magnet. </LI> </UL> </P>
Design and development of the helicity injection system in Versatile Experiment Spherical Torus
Conceptual design and implementation of Pulse Automation and Scheduling System for KSTAR
Design of a Thomson scattering diagnostic system for VEST