1 주철민, "작업투입시점과 순서의존적인 준비시간이 존재하는 병렬기계 일정계획을 위한 개선 개미군집 시스템" 대한산업공학회 35 (35): 218-225, 2009
2 Hop, N. V., "The scheduling problem of PCBs for multiple non-identical parallel machines" 158 : 577-594, 2004
3 Pinedo, M., "Scheduling theory, algorithms, and systems" Prentice-Hall 1995
4 Pfund, M., "Scheduling jobs on parallel machines with setup times and ready times" 54 : 764-782, 2008
5 Behnamian, J., "Parallel- machine scheduling problems with sequencedependent setup times using an ACO, SA and VNS hybrid algorithm" 36 : 9637-9644, 2009
6 Cheng, R., "Parallel Machine Scheduling Problems Using Memetic Algorithms" 33 (33): 761-764, 1997
7 Balin, S., "Non-identical parallel machine scheduling using genetic algorithm" 38 : 6814-6821, 2011
8 Agarwal, A., "Heuristics and augmented neural networks for task scheduling with non-identical machines" 175 (175): 296-317, 2006
9 Gen, M., "Genetic Algorithms and Engineering Optimization" Wiley 2000
10 Tavakkoli-Moghaddam, R., "Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints" 36 : 3224-3230, 2009
1 주철민, "작업투입시점과 순서의존적인 준비시간이 존재하는 병렬기계 일정계획을 위한 개선 개미군집 시스템" 대한산업공학회 35 (35): 218-225, 2009
2 Hop, N. V., "The scheduling problem of PCBs for multiple non-identical parallel machines" 158 : 577-594, 2004
3 Pinedo, M., "Scheduling theory, algorithms, and systems" Prentice-Hall 1995
4 Pfund, M., "Scheduling jobs on parallel machines with setup times and ready times" 54 : 764-782, 2008
5 Behnamian, J., "Parallel- machine scheduling problems with sequencedependent setup times using an ACO, SA and VNS hybrid algorithm" 36 : 9637-9644, 2009
6 Cheng, R., "Parallel Machine Scheduling Problems Using Memetic Algorithms" 33 (33): 761-764, 1997
7 Balin, S., "Non-identical parallel machine scheduling using genetic algorithm" 38 : 6814-6821, 2011
8 Agarwal, A., "Heuristics and augmented neural networks for task scheduling with non-identical machines" 175 (175): 296-317, 2006
9 Gen, M., "Genetic Algorithms and Engineering Optimization" Wiley 2000
10 Tavakkoli-Moghaddam, R., "Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints" 36 : 3224-3230, 2009
11 Garey, M., "Computers and intractability: A guide to the theory of NP-completeness" W. H. Freeman 1997
12 Mendes, A. S., "Comparing metaheuristic approaches for parallel machine scheduling problems" 13 : 143-154, 2002
13 Yalaoui, F., "An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times" 35 (35): 183-190, 2003
14 Holland, J. H., "Adaptation in natural and artificial systems" University of Michigan Press 1975
15 Allahverdi, A., "A survey of scheduling problems with setup times and costs" 187 : 985-1032, 2008
16 Nait, T. D., "A new approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times based on linear programming" 3 : 266-274, 2003
17 Tahar, D., "A linear programming approach for identical parallel machine scheduling with job splitting and sequence- dependent setup times" 99 : 63-73, 2006
18 Sveltana, A., "A heuristic algorithm for minimizing mean flow time with unit setups" 79 : 291-296, 2001
19 Vallada, E., "A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times" 211 : 612-622, 2011