To establish the initial ignition and combustion conditions for large-scale gas turbine, a substantial amount of rotational power is essential. This rotational power achieved through the utilization of a synchronous generator that is coaxially connect...
To establish the initial ignition and combustion conditions for large-scale gas turbine, a substantial amount of rotational power is essential. This rotational power achieved through the utilization of a synchronous generator that is coaxially connected to the gas turbine. The synchronous generator functions as a synchronous motor and is operated by a high-capacity motor drive system referred to as the gas turbine start-up equipment. This paper presents the constructure, design specifications, and manufactured system of the start-up equipment, which has been applied the localization model for large-scale gas turbine for the first time in Korea. Additionally, we present the results of on-site demonstration tests.