1 이익선, "두 단계 흐름생산라인에서 가중완료시간을 최소화하기 위해 아웃소싱 전략을 활용하는 일정계획문제" 한국경영과학회 39 (39): 29-39, 2022
2 Lee, K., "Two-stage production scheduling with an outsourcing option" 213 : 489-497, 2011
3 Qi, X., "Two-stage production scheduling with an option of outsourcing from a remote supplier" 18 : 1-15, 2009
4 Choi, B. C., "Two-machine flow shop scheduling problem with an outsourcing option" 213 (213): 66-72, 2011
5 Lu, L., "Single machine scheduling with outsourcing under different fill rates or quantity discount rates" 37 : 1950033-, 2020
6 Lee, I. S., "Single machine scheduling with outsourcing allowed" 111 : 623-634, 2008
7 Zhong, W., "Single machine scheduling problems with subcontracting options" 26 : 489-498, 2013
8 Mokhtari, H., "Scheduling with an Outsourcing Option on Both Manufacturer and Subcontractors" 40 : 1234-1242, 2013
9 Kim, E. S., "Scheduling of two-machine flowshop with outsourcing lead-time" 145 : 105864-, 2022
10 Liu, Z., "Resource consumption minimization with a constraint of maximum tardiness on parallel machines" 97 : 191-201, 2016
1 이익선, "두 단계 흐름생산라인에서 가중완료시간을 최소화하기 위해 아웃소싱 전략을 활용하는 일정계획문제" 한국경영과학회 39 (39): 29-39, 2022
2 Lee, K., "Two-stage production scheduling with an outsourcing option" 213 : 489-497, 2011
3 Qi, X., "Two-stage production scheduling with an option of outsourcing from a remote supplier" 18 : 1-15, 2009
4 Choi, B. C., "Two-machine flow shop scheduling problem with an outsourcing option" 213 (213): 66-72, 2011
5 Lu, L., "Single machine scheduling with outsourcing under different fill rates or quantity discount rates" 37 : 1950033-, 2020
6 Lee, I. S., "Single machine scheduling with outsourcing allowed" 111 : 623-634, 2008
7 Zhong, W., "Single machine scheduling problems with subcontracting options" 26 : 489-498, 2013
8 Mokhtari, H., "Scheduling with an Outsourcing Option on Both Manufacturer and Subcontractors" 40 : 1234-1242, 2013
9 Kim, E. S., "Scheduling of two-machine flowshop with outsourcing lead-time" 145 : 105864-, 2022
10 Liu, Z., "Resource consumption minimization with a constraint of maximum tardiness on parallel machines" 97 : 191-201, 2016
11 Liao, B., "Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration" 78 : 717-742, 2020
12 Hong, J. M., "Outsourcing decisions in single machine scheduling problem with multiple external facilities" 24 : 603-609, 2016
13 Chung D. Y., "Outsourcing and scheduling for two-machine ordered flow shop scheduling problems" 226 : 46-52, 2013
14 Qi, X., "Outsourcing and production scheduling for a two-stage flowshop" 129 : 43-50, 2011
15 Lee, I. S., "Minimizing due date related measures for a single machine scheduling with outsourcing allowed" 186 : 931-952, 2008
16 Wang, S., "Approximation algorithms for the min-max regret identical parallel machine scheduling problem with outsourcing and uncertain processing time" 1766721-, 2020
17 Neto, R. F. T., "An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed" 26 : 527-538, 2015
18 Tseng, L. Y., "A hybrid genetic local search algorithm for the permutation flowshop scheduling problem" 198 (198): 84-92, 2009
19 Wu, W. H., "A heuristic-based genetic algorithm for the two-machine flowshop scheduling with learning consideration" 35 : 223-233, 2015
20 Tseng, L. Y., "A genetic local search algorithm for minimizing total flowtime in the permutation flowshop scheduling problem" 127 (127): 121-128, 2010