In this study, DWTP Advisor developed from U.S. EPA was adapted for performance assessment in small water treatment plant and studied for improvement advice about the problem. From results of performance assessment, the ability of each major unit proc...
In this study, DWTP Advisor developed from U.S. EPA was adapted for performance assessment in small water treatment plant and studied for improvement advice about the problem. From results of performance assessment, the ability of each major unit process meets to Peak Instantaneous Flow(PIF) as Type I (above 95% of PIF) in N WTP. But, outlet condition in the sedimentation basin are permitting the loss of solids from the basin and the lack of proper solids removal is degrading the performance in N WTP. From results of the hydraulic analysis using fluoride tracer, flow rate in sedimentation basin is rapidly more lower than upper. The Reynolds number, Re, and Froude number, Fr which are used to predict flow condition in sedimentation basin is calculated to be 3159.98 and 2.06×10exp(-7), respectively. There is possibility of occurrence of short-circuiting and turbulence. Also, the different type of effluent trough makes unstable flow in sedimentation basin and increases carry-overing of sedimented solids.