1 Castagliola, P., "The variable sample size ¯X chart with estimated parameters" 28 : 687-699, 2012
2 Patnaik, P. B., "The use of mean range as an estimator of variance in statistical tests" 37 : 78-87, 1950
3 Low, C. K., "The revised m-of-k runs rule based on median run length" 41 : 1463-1477, 2012
4 Bischak, D. P., "The rate of false signals in charts with estimated limits" 39 : 54-65, 2007
5 Jones, L. A., "The performance of exponentially weighted moving average charts with estimated parameters" 43 : 156-167, 2001
6 Chen, G., "The mean and standard deviation of the run length distribution of ¯X charts when control limits are estimated" 7 : 789-798, 1997
7 Quesenberry, C. P., "The effect of sample size on estimated limits for ¯X and X control charts" 25 : 237-247, 1993
8 Lee, J., "The effect of parameter estimation on upper-sided Bernoulli cumulative sum charts" 29 : 639-651, 2013
9 Saleh, N. A., "The difficulty in designing Shewhart ¯X and X control charts with estimated parameters" 47 : 127-138, 2015
10 Montgomery, D. C., "Statistical quality control : A modern introduction" John Wiley & Sons, Inc 2013
1 Castagliola, P., "The variable sample size ¯X chart with estimated parameters" 28 : 687-699, 2012
2 Patnaik, P. B., "The use of mean range as an estimator of variance in statistical tests" 37 : 78-87, 1950
3 Low, C. K., "The revised m-of-k runs rule based on median run length" 41 : 1463-1477, 2012
4 Bischak, D. P., "The rate of false signals in charts with estimated limits" 39 : 54-65, 2007
5 Jones, L. A., "The performance of exponentially weighted moving average charts with estimated parameters" 43 : 156-167, 2001
6 Chen, G., "The mean and standard deviation of the run length distribution of ¯X charts when control limits are estimated" 7 : 789-798, 1997
7 Quesenberry, C. P., "The effect of sample size on estimated limits for ¯X and X control charts" 25 : 237-247, 1993
8 Lee, J., "The effect of parameter estimation on upper-sided Bernoulli cumulative sum charts" 29 : 639-651, 2013
9 Saleh, N. A., "The difficulty in designing Shewhart ¯X and X control charts with estimated parameters" 47 : 127-138, 2015
10 Montgomery, D. C., "Statistical quality control : A modern introduction" John Wiley & Sons, Inc 2013
11 Ghosh, B. K., "Shewhart ¯X-charts with estimated process variance" 10 : 1797-1822, 1981
12 Chakraborti, S., "Run length, average run length and false alarm rate of Shewhart X-bar chart : Exact derivations by conditioning" 29 : 61-81, 2000
13 Del Castillo, E., "Run length distribution and economic design of charts with unknown process variance" 43 : 189-201, 1996
14 Chakraborti, S., "Parameter estimation and design considerations in prospective applications of the ¯X-Chart" 33 : 439-459, 2006
15 Khoo, M. B. C., "Optimal design of the synthetic chart for the process mean based on median run length" 44 : 765-779, 2012
16 Faraz, A., "Guaranteed conditional performance of the control chart with estimated parameters" 53 : 4405-4413, 2015
17 Zhang, M., "Geometric charts with estimated control limits" 29 : 209-223, 2013
18 Zhang, M., "Exponential CUSUM charts with estimated control limits" 30 : 275-286, 2014
19 Mahmoud, M. A., "Estimating the standard deviation in quality control application" 42 : 348-357, 2010
20 Golosnoy, V., "EWMA control charts for monitoring optimal portfolio weights" 26 : 195-224, 2007
21 Jones, M. A., "Assessing the effect of estimation error on the risk-adjusted CUSUM chart performance" 24 : 176-181, 2012
22 Gan, F. F., "An optimal design of EWMA control charts based on median run length" 45 : 169-184, 1993
23 Derman, C., "An improved estimator of in quality control" 9 : 411-415, 1995
24 Aly, A. A., "A reevaluation of the adaptive exponentially weighted moving average control chart when parameters are estimated" 31 : 1611-1622, 2015
25 Das, N., "A comparison study of three non-parametric control charts to detect shift in location parameters" 41 : 799-807, 2009
26 Vardeman, S. B., "A brief tutorial on the estimation of the process standard deviation" 31 : 503-507, 1999