RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재 SCIE SCOPUS

      A study on the uncertainty of setpoint for reactor trip system of NPPs considering rectangular distributions

      한글로보기

      https://www.riss.kr/link?id=A109049779

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      The setpoint of the reactor trip system shall be set to consider the measurement uncertainty of the instrument channel and provide a reasonable and sufficient margin between the analytical limit and the trip setpoint.
      A comparative analysis was conducted to find out an appropriate uncertainty combination method through an example problem. The four methods were evaluated; 1) ISA-67.04.01 method, 2) the GUM95 method, 3) the modified GUM method developed by Fotowicz, and 4) the modified IEC61888 method proposed by authors for the pressure instrument channel presented in ISA-RP67.04.02 example. The appropriateness of each method was validated by comparing it with the result of Monte Carlo simulation.
      As a result of the evaluation, all methods are appropriate when all measurement uncertainty elements are normally distributed as expected. But ISA-67.04 method and GUM95 method overestimated the channel uncertainty if there is a dominant input element with rectangular distribution among the uncertainty input elements.
      Modified GUM95 methods developed by Fotowicz and modified IEC61888 method by authors are able to produce almost the same level of channel uncertainty as the Monte Carlo method, even when there is a dominant rectangular distribution among the uncertainty components, without computer-assisted simulations.
      번역하기

      The setpoint of the reactor trip system shall be set to consider the measurement uncertainty of the instrument channel and provide a reasonable and sufficient margin between the analytical limit and the trip setpoint. A comparative analysis was conduc...

      The setpoint of the reactor trip system shall be set to consider the measurement uncertainty of the instrument channel and provide a reasonable and sufficient margin between the analytical limit and the trip setpoint.
      A comparative analysis was conducted to find out an appropriate uncertainty combination method through an example problem. The four methods were evaluated; 1) ISA-67.04.01 method, 2) the GUM95 method, 3) the modified GUM method developed by Fotowicz, and 4) the modified IEC61888 method proposed by authors for the pressure instrument channel presented in ISA-RP67.04.02 example. The appropriateness of each method was validated by comparing it with the result of Monte Carlo simulation.
      As a result of the evaluation, all methods are appropriate when all measurement uncertainty elements are normally distributed as expected. But ISA-67.04 method and GUM95 method overestimated the channel uncertainty if there is a dominant input element with rectangular distribution among the uncertainty input elements.
      Modified GUM95 methods developed by Fotowicz and modified IEC61888 method by authors are able to produce almost the same level of channel uncertainty as the Monte Carlo method, even when there is a dominant rectangular distribution among the uncertainty components, without computer-assisted simulations.

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼