1 X. Gu, "Worst case propagated uncertainty of multidisciplinary systems in robust design optimization" 20 (20): 190-213, 2000
2 O. Hagen, "Vector process out-crossing as parallel system sensitivity measure" 117 (117): 2201-2220, 1991
3 N. Xiao, "Unified uncertainty analysis by the mean value first order saddlepoint approximation" 46 (46): 803-812, 2012
4 W. Wu, "Uncertainty analysis and allocation of joint tolerances in robot manipulators based on interval analysis" 92 (92): 54-64, 2007
5 J. Zhang, "Time-dependent reliability analysis for function generator mechanisms" 133 (133): 031005-, 2011
6 C. Andrieu-Renaud, "The PHI2 method: A way to compute time variant reliability" 84 (84): 75-86, 2004
7 P. Meng, "Structure optimal design of four-high rolling mill stand based on improved collaborative optimization algorithm" 5 (5): 843-851, 2013
8 O. Ditlevsen, "Structural reliability methods" John Wiley & Sons 2005
9 C. Liang, "Stochastic multidisciplinary analysis with high-dimensional coupling" 54 (54): 1209-1219, 2016
10 B. Sudret, "Stochastic finite element methods and reliability, a state-of-the-art report, Report UCB/SEMM-2000/08" University of California 2000
1 X. Gu, "Worst case propagated uncertainty of multidisciplinary systems in robust design optimization" 20 (20): 190-213, 2000
2 O. Hagen, "Vector process out-crossing as parallel system sensitivity measure" 117 (117): 2201-2220, 1991
3 N. Xiao, "Unified uncertainty analysis by the mean value first order saddlepoint approximation" 46 (46): 803-812, 2012
4 W. Wu, "Uncertainty analysis and allocation of joint tolerances in robot manipulators based on interval analysis" 92 (92): 54-64, 2007
5 J. Zhang, "Time-dependent reliability analysis for function generator mechanisms" 133 (133): 031005-, 2011
6 C. Andrieu-Renaud, "The PHI2 method: A way to compute time variant reliability" 84 (84): 75-86, 2004
7 P. Meng, "Structure optimal design of four-high rolling mill stand based on improved collaborative optimization algorithm" 5 (5): 843-851, 2013
8 O. Ditlevsen, "Structural reliability methods" John Wiley & Sons 2005
9 C. Liang, "Stochastic multidisciplinary analysis with high-dimensional coupling" 54 (54): 1209-1219, 2016
10 B. Sudret, "Stochastic finite element methods and reliability, a state-of-the-art report, Report UCB/SEMM-2000/08" University of California 2000
11 X. Du, "Sequential optimization and reliability assessment method for efficient probabilistic design" 126 (126): 225-233, 2004
12 A. Karamchandani, "Senitivity estimation within first and second order reliability methods" 11 (11): 95-107, 1992
13 M. Li, "Robust optimization and sensitivity analysis with multi-objective genetic algorithms: Single-and multidisciplinary applications" University of Maryland 2007
14 Masahiro Toyoda, "Robust multiobjective optimization method using satisficing trade-off method" 대한기계학회 29 (29): 1361-1367, 2015
15 Thanh-Phong Dao, "Robust design for a flexible bearing with 1-DOF translation using the Taguchi method and the utility concept" 대한기계학회 29 (29): 3309-3320, 2015
16 W. Yao, "Review of uncertainty-based multidisciplinary design optimization methods for aerospace vehicles" 47 (47): 450-479, 2011
17 X. Huang, "Reliability-sensitivity analysis using dimension reduction methods and saddlepoint approximations" 93 (93): 857-886, 2013
18 Z. Yang, "Reliability-based sensitivity design of gear pairs with non-Gaussian random parameters" 121-126 : 3411-3418, 2012
19 손영갑, "Reliability prediction of engineering systems with competing failure modes due to component degradation" 대한기계학회 25 (25): 1717-1725, 2011
20 J. Li, "Reliability estimation for time dependent problems using a niching genetic algorithm" American Society of Mechanical Engineers 2007
21 L. Xie, "Reliability degradation of mechanical components and systems;Handbook of performability engineering" Springer 413-429, 2008
22 H. Liu, "Probabilistic analytical target cascading-a moment matching formulation for multilevel optimization under uncertainty" 128 (128): 991-1000, 2006
23 P. Bjerager, "Parametric sensitivity in first order reliability theory" 115 (115): 1577-1582, 1989
24 J. O. Royset, "Optimal design with probabilistic objectives and constraints" 132 (132): 107-118, 2006
25 N. Kuschel, "Optimal design under time-variant reliability constraints" 22 (22): 113-127, 2000
26 A. Singh, "On the time-dependent reliability of non-monotonic, non-repairable systems" 3 : 425-444, 2010
27 J. D. Sorensen, "Notes in structural reliability theory and risk analysis" Aalborg 2004
28 M. Li, "Multi-objective collaborative robust optimization with interval uncertainty and interdisciplinary uncertainty propagation" 130 (130): 081402-, 2008
29 X. Du, "Methodology for uncertainty propagation and management in simulation-based systems design" 38 (38): 1471-1478, 2000
30 S. Sankararaman, "Likelihood-based approach to multidisciplinary analysis under uncertainty" 134 (134): 031008-, 2012
31 X. Gu, "Implicit uncertainty propagation for robust collaborative optimization" 128 (128): 1001-1013, 2006
32 P. Gao, "Fuzzy dynamic reliability models of parallel mechanical systems considering strength degradation path dependence and failure dependence" 1-9, 2015
33 L. Chan, "Evaluation of two concurrent design approaches in multidisciplinary design optimization, NRC report LMA-077" Canadian Aeronautics and Space Institute 2001
34 X. Du, "Efficient uncertainty analysis methods for multidisciplinary robust design" 40 (40): 545-552, 2002
35 X. Wang, "Dynamic reliabilitybased robust optimization design for a torsion bar" 223 (223): 483-490, 2009
36 S. Ferson, "Different methods are needed to propagate ignorance and variability" 54 (54): 133-144, 1996
37 G. J. Savage, "Dependability-based design optimization of degrading engineering systems" 131 (131): 011002-, 2009
38 X. Zhang, "Degradation prediction model based on a neural network with dynamic windows" 15 (15): 6996-7015, 2015
39 L. Brevault, "Decoupled multidisciplinary design optimization formulation for interdisciplinary coupling satisfaction under uncertainty" 54 (54): 186-205, 2016
40 A. Chiralaksanakul, "Decoupled approach to multidisciplinary design optimization under uncertainty" 8 (8): 21-42, 2007
41 X. Du, "Collaborative reliability analysis under the framework of multidisciplinary systems design" 6 (6): 63-84, 2005
42 B. Sudret, "Analytical derivation of the outcrossing rate in time variant reliability problems" 4 (4): 353-362, 2008
43 Z. Jiang, "A spatialrandom-process based multidisciplinary system uncertainty propagation approach with model uncertainty" 137 (137): 101402-, 2015
44 Haiyan Li, "A new method based on LPP and NSGA-II for multiobjective robust collaborative optimization" 대한기계학회 25 (25): 1071-1079, 2011
45 Z. Wang, "A nested extreme response surface approach for time-dependent reliability-based design optimization" 134 (134): 121007-, 2012
46 R. E. Melchers, "A fast approximate method for parameter sensitivity estimation in Monte Carlo structural reliability" 82 (82): 55-61, 2004