      다국어 초록 (Multilingual Abstract)

      Time-Cost Trade-off Problem(TCTP) is a major problem in the construction industry because buildings are now high-rised, complex and large-sized. And high-rise building is composed of repetitive activities. Tact, which is one of the well structured scheduling methods, is suggested to reflect this repetitiveness. But it is hard to achieve perfect TCTP. Also Tact system itself has some limitations, so that people can not make ideal schedule. The purpose of this study was to indicate limitations of Tact scheduling method, also supplementing those limitations by applying options and Theory of Constraints. So that we can choose an ideal scheduling method to make construction schedule for high-rise building finishing work.
      번역하기

      Time-Cost Trade-off Problem(TCTP) is a major problem in the construction industry because buildings are now high-rised, complex and large-sized. And high-rise building is composed of repetitive activities. Tact, which is one of the well structured sch...

      Time-Cost Trade-off Problem(TCTP) is a major problem in the construction industry because buildings are now high-rised, complex and large-sized. And high-rise building is composed of repetitive activities. Tact, which is one of the well structured scheduling methods, is suggested to reflect this repetitiveness. But it is hard to achieve perfect TCTP. Also Tact system itself has some limitations, so that people can not make ideal schedule. The purpose of this study was to indicate limitations of Tact scheduling method, also supplementing those limitations by applying options and Theory of Constraints. So that we can choose an ideal scheduling method to make construction schedule for high-rise building finishing work.

      더보기

      목차 (Table of Contents)

      • Abstract
      • 1. 서론
      • 2. 예비적 고찰
      • 3. 택트공정계획기법의 제한성 보완
      • 4. 결론 및 향후 연구
      • Abstract
      • 1. 서론
      • 2. 예비적 고찰
      • 3. 택트공정계획기법의 제한성 보완
      • 4. 결론 및 향후 연구
      • 후기
      • 참고문헌
      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼