      건축공사의 적정공기 산정방안에 관한 연구 = The Estimation of process Management in Construction Project

      한글로보기

      https://www.riss.kr/link?id=A1999575

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      It is important to optimize process management, aiming not only at construction terms but also at finding general solution. This paper is focused on finding better methods for estimating construction term more accurately. There are two main problems in domestic estimation methods. Firstly, the characteristics of each construction fields are overlooked. Only numerical factors considered, and specific circumstances of each fields are excluded in estimating construction term. The second problem lack of understanding new environments of construction fields. Environments in construction fieids may vary by society and time, such as scarcity of skilled workers, and can seriously affect construction term. This paper suggested followings as a solution for what should considered in estimating construction term.
      1) Reductable dates caused by "Form Construction"
      2) Considering non-working ratio on holydays/national holydays.
      3) Application of rainfall to term estimation for sensitive steps to weather.
      4) Adjustment of recess during winter time.
      5) Specially improved methods of inserting concrete for regions average temperature of which is higher than 25℃.
      번역하기

      It is important to optimize process management, aiming not only at construction terms but also at finding general solution. This paper is focused on finding better methods for estimating construction term more accurately. There are two main problems i...

      It is important to optimize process management, aiming not only at construction terms but also at finding general solution. This paper is focused on finding better methods for estimating construction term more accurately. There are two main problems in domestic estimation methods. Firstly, the characteristics of each construction fields are overlooked. Only numerical factors considered, and specific circumstances of each fields are excluded in estimating construction term. The second problem lack of understanding new environments of construction fields. Environments in construction fieids may vary by society and time, such as scarcity of skilled workers, and can seriously affect construction term. This paper suggested followings as a solution for what should considered in estimating construction term.
      1) Reductable dates caused by "Form Construction"
      2) Considering non-working ratio on holydays/national holydays.
      3) Application of rainfall to term estimation for sensitive steps to weather.
      4) Adjustment of recess during winter time.
      5) Specially improved methods of inserting concrete for regions average temperature of which is higher than 25℃.

      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼