RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      Analysis and Simulation on Intermittent Arc Grounding Overvoltage for Neutral Grounding via Arc-suppression Coil with Shunt Resistance in 35 kV Urban Distribution System

      한글로보기

      https://www.riss.kr/link?id=A100237509

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Due to the significant increase of line-to-ground capacitive current, for urban distribution networks mixed by overhead lines and a larger number of cables, the higher electromagnetic transient overvoltage presents not only always on fault phase and neutral point, but also on non-fault phases when some intermittent arc grounding faults occur. Some arc-suppression coil which has a relatively smaller overcompensation tuning-off degree is mainly used to compensate the line-to-ground capacitive current, reduce the arc residual current and reignition times, and then increase the self-restoration probability after a single phase intermittent arc grounding fault occurs. At the same time, according to the characteristics and performance requirements of distribution systems, a relatively smaller shunt resistance is mainly used to quickly release the charge of line-to-ground capacitance, improve the decay rate of overvoltage of fault phase, non-fault phases and neutral point respectively, reduce the rising speed of neutral point recovery voltage and its amplitude after the intermittent arc dies out, so that the transient overvoltage can be restrained effectively. Results of transient numerical analysis and ATP simulation have demonstrated the mode of neutral grounding via arc-suppression coil with shunt resistance is an optimum choice which is applicable to 35 kV urban distribution networks mixed by overhead lines and cables.
      번역하기

      Due to the significant increase of line-to-ground capacitive current, for urban distribution networks mixed by overhead lines and a larger number of cables, the higher electromagnetic transient overvoltage presents not only always on fault phase and n...

      Due to the significant increase of line-to-ground capacitive current, for urban distribution networks mixed by overhead lines and a larger number of cables, the higher electromagnetic transient overvoltage presents not only always on fault phase and neutral point, but also on non-fault phases when some intermittent arc grounding faults occur. Some arc-suppression coil which has a relatively smaller overcompensation tuning-off degree is mainly used to compensate the line-to-ground capacitive current, reduce the arc residual current and reignition times, and then increase the self-restoration probability after a single phase intermittent arc grounding fault occurs. At the same time, according to the characteristics and performance requirements of distribution systems, a relatively smaller shunt resistance is mainly used to quickly release the charge of line-to-ground capacitance, improve the decay rate of overvoltage of fault phase, non-fault phases and neutral point respectively, reduce the rising speed of neutral point recovery voltage and its amplitude after the intermittent arc dies out, so that the transient overvoltage can be restrained effectively. Results of transient numerical analysis and ATP simulation have demonstrated the mode of neutral grounding via arc-suppression coil with shunt resistance is an optimum choice which is applicable to 35 kV urban distribution networks mixed by overhead lines and cables.

      더보기

      목차 (Table of Contents)

      • Abstract
      • 1. Introduction
      • 2. Transient Numerical Analysis
      • 3. Simulation of Arc Grounding for 35 kV Urban Distribution System
      • 3.1. Model and Simulation for One 35 kV Urban Distribution System
      • Abstract
      • 1. Introduction
      • 2. Transient Numerical Analysis
      • 3. Simulation of Arc Grounding for 35 kV Urban Distribution System
      • 3.1. Model and Simulation for One 35 kV Urban Distribution System
      • 3.2. Selection of Neutral Grounding Mode
      • 3.3. Selection of Overcompensation Tuning-off Degree
      • 3.4. Selection of Shunt Resistance Value
      • 4. Conclusion
      • Acknowledgments
      • References
      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼